Hi Fields Lateral
From the ProvenHand pipeline wiki
Hi Fields Lateral is a natural gas pipeline lateral in Alabama and Mississippi, operated by Southeast Supply Header, LLC. It entered service in 2009. It runs 11 miles of 16" pipe.
| Hi Fields Lateral | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Part of | Southeast Supply Header[2] |
| States | Alabama, Mississippi[1] |
| Approved | 20 September 2007[3] |
| In service | 11 January 2009[1] |
| FERC dockets | CP07-44[1], CP07-45[1] |
| FERC pre-filing docket | PF06-28[1] |
| Technical information | |
| Length | 11 mi[1] |
| Pipe size | 16"[1] |
| Capacity | 175 MMcf/d additional capacity (EIA)[1] |
| Cost | $22.5 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Hi Fields Lateral is a natural gas pipeline lateral in Alabama and Mississippi, operated by Southeast Supply Header, LLC. It entered service in 2009. It runs 11 miles of 16" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Hi Fields Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Amendment Application, Southeast Supply Header, LLC, Docket Nos. CP07-44-002 and CP07-45-001”. Federal Energy Regulatory Commission. 13 February 2008. Retrieved 4 October 2026.
- “Order issuing certificate(s), docket CP07-44: Order issuing certificates re Southeast Supply Header, LLC et al under CP07-44.”. Federal Energy Regulatory Commission. 20 September 2007. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.