Hi Fields Lateral

From the ProvenHand pipeline wiki

Hi Fields Lateral is a natural gas pipeline lateral in Alabama and Mississippi, operated by Southeast Supply Header, LLC. It entered service in 2009. It runs 11 miles of 16" pipe.

Hi Fields Lateral
General information
KindPipeline project[1]
Project typeLateral[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Part ofSoutheast Supply Header[2]
StatesAlabama, Mississippi[1]
Approved20 September 2007[3]
In service11 January 2009[1]
FERC docketsCP07-44[1], CP07-45[1]
FERC pre-filing docketPF06-28[1]
Technical information
Length11 mi[1]
Pipe size16"[1]
Capacity175 MMcf/d additional capacity (EIA)[1]
Cost$22.5 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Hi Fields Lateral is a natural gas pipeline lateral in Alabama and Mississippi, operated by Southeast Supply Header, LLC. It entered service in 2009. It runs 11 miles of 16" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Hi Fields Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Notice of Amendment Application, Southeast Supply Header, LLC, Docket Nos. CP07-44-002 and CP07-45-001”. Federal Energy Regulatory Commission. 13 February 2008. Retrieved 4 October 2026.
  3. “Order issuing certificate(s), docket CP07-44: Order issuing certificates re Southeast Supply Header, LLC et al under CP07-44.”. Federal Energy Regulatory Commission. 20 September 2007. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.