Southeast Supply Header

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Southeast Supply Header is a natural gas pipeline in Louisiana, Mississippi and Alabama, operated by Southeast Supply Header LLC. It entered service in 2008.[1]

Southeast Supply Header
Also calledSESH[2], Southeast Supply Header Pipeline, SoNat SESH Project[2]
General information
Project typeNew build[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
Facility project
StatesLouisiana, Mississippi, Alabama[1][2]
Approved20 September 2007[2][4]
In service5 October 2008[1]
FERC docketsCP07-44[1], CP07-45[1]
FERC pre-filing docketPF06-28[1]
Contractors
Technical information
Length270 mi[1] or 115.4 mi[2] or 154 mi[2] or 269 mi[4][sources disagree]
Pipe size42", 36"
Diameters36 and 42 in[1]
Capacity1140 MMcf/d additional capacity (EIA)[1] or 140 MMcf/d (FERC project list)[2] or 1000 MMcf/d (FERC project list)[2][sources disagree]
Cost$842 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Southeast Supply Header is a natural gas pipeline in Louisiana, Mississippi and Alabama, operated by Southeast Supply Header LLC. It entered service in 2008.[1]

Contractorsedit

ContractorWorkScopeSpread
Milbar Hydro-Test, Inc.[5]HydrotestStation, valve and fabrication testing; cleaning, filling, hydrostatic test, dewatering, caliper and drying: 47 tests, 104 miles of 42-inch (firm's figures)Spread 1
Milbar Hydro-Test, Inc.[5]HydrotestStation, valve and fabrication testing; cleaning, filling, hydrostatic test, dewatering, caliper and drying: 26 tests, 83 miles of 36-inch (firm's figures)Spread 2

Spreads

Spread
Spread 1[5]
Spread 2[5]

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 1140 MMcf/d additional capacity (EIA)[1]
  • 140 MMcf/d (FERC project list)[2]
  • 1000 MMcf/d (FERC project list)[2]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Southeast Supply Header? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  3. “Notice of Amendment Application, Southeast Supply Header, LLC, Docket Nos. CP07-44-002 and CP07-45-001”. Federal Energy Regulatory Commission. 13 February 2008. Retrieved 4 October 2026.
  4. “Order issuing certificate(s), docket CP07-44: Order issuing certificates re Southeast Supply Header, LLC et al under CP07-44.”. Federal Energy Regulatory Commission. 20 September 2007. Retrieved 4 October 2026.
  5. “SESH - Spectra & Enable (project page)”. Milbar Hydro-Test, Inc. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.