Hot Spring Lateral Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Hot Spring Lateral Project is a natural gas pipeline lateral, operated by Texas Eastern Transmission, LP. It entered service in 2011. It runs 8.4 miles of 16" pipe.
| Hot Spring Lateral Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | AR[1] or AR, TX[2][sources disagree] |
| Counties | Hot Spring, Nevada, White[3] |
| Approved | 16 December 2010[1] |
| In service | 15 June 2011[2] |
| FERC docket | CP10-471[1] |
| Technical information | |
| Length | 8.4 mi[1][2] |
| Pipe size | 16"[2] |
| Capacity | 112 MMcf/d (FERC project list)[1][2] |
| Cost | $38.124 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Hot Spring Lateral Project is a natural gas pipeline lateral, operated by Texas Eastern Transmission, LP. It entered service in 2011. It runs 8.4 miles of 16" pipe.
Inspection
| Firm | Scope |
|---|---|
| Tetra Tech, Inc.[3] | FERC contractor on FERC's April 2011 environmental compliance field inspection of the project |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Hot Spring Lateral Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Environmental Compliance Inspection Report, Hot Spring Lateral Project, April 6, 2011 (CP10-471)”. Federal Energy Regulatory Commission. 22 April 2011. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.