Iroquois 08/09 Expansion Phase 1

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Iroquois 08/09 Expansion Phase 1 is a natural gas pipeline expansion in Connecticut and New York, operated by Iroquois Pipeline Co. It runs 1.6 miles of 36" pipe.

Iroquois 08/09 Expansion Phase 1
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Part ofIroquouis Gas Transmission System 08/09 Expansion Project[2]
StatesConnecticut, New York[1]
In service15 November 2008[1] or 14 November 2008[2][sources disagree]
FERC docketCP07-457[1]
FERC pre-filing docketPF07-7[1]
Contractors
Technical information
Length1.6 mi[1]
Pipe size36"[1]
Capacity95 MMcf/d additional capacity (EIA)[1]
Cost$58 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Iroquois 08/09 Expansion Phase 1 is a natural gas pipeline expansion in Connecticut and New York, operated by Iroquois Pipeline Co. It runs 1.6 miles of 36" pipe.

Contractorsedit

ContractorWorkScope
Schmid[3]PrimePipeline contractor for the Newtown Loop (Phase 1), 2008; named only as 'Schmid' (once 'Schmidt') in Iroquois' status reports

Inspection

FirmScope
Field Safety Corporation[4]Environmental inspection contractor on the Newtown Loop (2008 status reports)

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 15 November 2008[1]
  • 14 November 2008[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Iroquois 08/09 Expansion Phase 1? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Iroquois notice that Phase 1 (Newtown Loop) of the 08/09 Expansion Project was placed into service (CP07-457)”. Iroquois Gas Transmission System, L.P. (filed with FERC). 19 November 2008. Retrieved 4 October 2026.
  3. “Iroquois 08/09 Newtown Loop bi-weekly environmental status report, period ending 2008-05-04 (CP07-457)”. Iroquois Gas Transmission System, L.P. (filed with FERC). 7 May 2008. Retrieved 4 October 2026.
  4. “Iroquois 08/09 Newtown Loop bi-weekly environmental status report, period ending 2008-04-20 (CP07-457)”. Iroquois Gas Transmission System, L.P. (filed with FERC). 24 April 2008. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.