Iroquouis Gas Transmission System 08/09 Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Iroquouis Gas Transmission System 08/09 Expansion Project is a pipeline project in Connecticut and New York, operated by Iroquouis Gas Transmission System, L.P.. It entered service in 2009.

Iroquouis Gas Transmission System 08/09 Expansion Project
General information
KindPipeline project[1]
StatusIn service[2]
Owner and operator
Facility projects
StatesConnecticut, New York[1][6]
Approved20 March 2008[1]
In service1 November 2009[2]
FERC docketCP07-457[1]
FERC pre-filing docketPF07-7[7]
Contractors
Technical information
Length84 mi[1] or 1.6 mi[6][sources disagree]
Pipe size36"[6]
Capacity200 MMcf/d (FERC project list)[1]
Cost$118.4 million estimated, after the Boonville and Wright NY loops were dropped (order, March 2008)[6]
On ProvenHand
Hands listed0

Iroquouis Gas Transmission System 08/09 Expansion Project is a pipeline project in Connecticut and New York, operated by Iroquouis Gas Transmission System, L.P.. It entered service in 2009.

Contractorsedit

ContractorWorkScope
Schmid[8][9]PrimePipeline contractor for the Newtown Loop (reports spell it Schmidt and Schmid)

Inspection

FirmScope
Field Safety Corporation[10]Environmental inspection contractor at the Newtown Loop and Milford Compressor Station

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Iroquouis Gas Transmission System 08/09 Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “Notice that the Brookfield Compressor Station portion of the 08/09 Expansion Project was placed into service (CP07-457), eLibrary record”. Iroquois Gas Transmission System, L.P. (filed with FERC). 3 November 2009. Retrieved 4 October 2026.
  3. “Iroquois notice that Phase 1 (Newtown Loop) of the 08/09 Expansion Project was placed into service (CP07-457)”. Iroquois Gas Transmission System, L.P. (filed with FERC). 19 November 2008. Retrieved 4 October 2026.
  4. “Iroquois Gas Transmission System, L.P. request to commence operation of Phase 2 of the 08/09 Expansion Project (Milford Compressor Station), CP07-457”. Iroquois Gas Transmission System, L.P. (FERC eLibrary). 12 December 2008. Retrieved 4 October 2026.
  5. “Iroquois Gas Transmission System, L.P. request to commence operation of Phase III of the 08/09 Expansion Project, CP07-457”. Iroquois Gas Transmission System, L.P. (FERC eLibrary). 13 October 2009. Retrieved 4 October 2026.
  6. “Order Issuing Certificate, Iroquois Gas Transmission System, L.P., 08/09 Expansion Project (CP07-457)”. Federal Energy Regulatory Commission. 20 March 2008. Retrieved 4 October 2026.
  7. “FERC eLibrary docket CP07-457”. Federal Energy Regulatory Commission. 28 September 2007. Retrieved 3 October 2026.
  8. “Iroquois 08/09 Newtown Loop bi-weekly environmental status report, period ending 2008-04-20 (CP07-457)”. Iroquois Gas Transmission System, L.P. (filed with FERC). 24 April 2008. Retrieved 4 October 2026.
  9. “Iroquois 08/09 Newtown Loop bi-weekly environmental status report, period ending 2008-05-04 (CP07-457)”. Iroquois Gas Transmission System, L.P. (filed with FERC). 7 May 2008. Retrieved 4 October 2026.
  10. “Bi-Weekly Construction Status Report, period ending July 27, 2008, Milford and Newtown (CP07-457)”. Iroquois Gas Transmission System, L.P. (filed with FERC). 30 July 2008. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.