Iroquois 08/09 Expansion Phase 2

From the ProvenHand pipeline wiki

Iroquois 08/09 Expansion Phase 2 is a natural gas pipeline expansion in Connecticut, operated by Iroquois Pipeline Co. It entered service in 2009.

Iroquois 08/09 Expansion Phase 2
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Part ofIroquouis Gas Transmission System 08/09 Expansion Project[2]
StateConnecticut[1]
In service14 January 2009[1]
FERC docketCP07-457[1]
FERC pre-filing docketPF07-7[1]
Technical information
Capacity80 MMcf/d additional capacity (EIA)[1]
Cost$41.7 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Iroquois 08/09 Expansion Phase 2 is a natural gas pipeline expansion in Connecticut, operated by Iroquois Pipeline Co. It entered service in 2009.

Inspection

FirmScope
Field Safety Corporation[3]Environmental inspection contractor at the Milford Compressor Station (Phase 2), 2008 status reports

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Iroquois 08/09 Expansion Phase 2? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Iroquois Gas Transmission System, L.P. request to commence operation of Phase 2 of the 08/09 Expansion Project (Milford Compressor Station), CP07-457”. Iroquois Gas Transmission System, L.P. (FERC eLibrary). 12 December 2008. Retrieved 4 October 2026.
  3. “Iroquois 08/09 Milford Compressor Station bi-weekly environmental status report, period ending 2008-06-01 (CP07-457)”. Iroquois Gas Transmission System, L.P. (filed with FERC). 4 June 2008. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.