Lawrence County Expansion Project is a pipeline project in Kentucky and West Virginia, operated by Columbia Gas Transmission, LLC. Construction began in 2015. It runs 3 miles of 16" pipe.

Lawrence County Expansion Project
General information
StatusUnder construction[1] or In service[2][sources disagree]
Owner and operator
StatesKentucky, West Virginia[4]
CountiesKentucky: Lawrence
West Virginia: Wayne
[4]
Construction started2015[5]
FERC docketCP15-19[3]
Technical information
Length3 mi[4]
Pipe size16"[4]
Capacity added72,000 Dth per day of transportation service to Kentucky Power Company[4]
Cost$24,500,000[6]
On ProvenHand
Hands listed0

Lawrence County Expansion Project is a pipeline project in Kentucky and West Virginia, operated by Columbia Gas Transmission, LLC. Construction began in 2015. It runs 3 miles of 16" pipe.

Inspection

FirmScope
Tetra Tech, Inc.[1]Third-party contractor to FERC performing construction compliance inspections of the project, named in FERC's field inspection report of June 23, 2015

Crossings

FeatureMethod
Big Sandy River[6]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Status
  • Under construction[1]
  • In service[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Lawrence County Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC field inspection report (June 23, 2015), Lawrence County Expansion Project (CP15-19)”. FERC (inspection by Tetra Tech, Inc. under contract to FERC). 7 July 2015. Retrieved 4 October 2026.
  2. “Weekly status report, September 19 to 25, 2016, Lawrence County Expansion Project (CP15-19)”. Columbia Gas Transmission, LLC (filed with FERC). 14 October 2016. Retrieved 4 October 2026.
  3. “FERC eLibrary docket CP15-19”. Federal Energy Regulatory Commission. 21 November 2014. Retrieved 3 October 2026.
  4. “FERC notice of request under blanket authorization, Lawrence County Expansion Project (CP15-19)”. FERC. 1 December 2014. Retrieved 4 October 2026.
  5. “Construction status report, February 23 to March 2, 2015, Lawrence County Expansion Project (CP15-19)”. Columbia Gas Transmission, LLC (filed with FERC). 10 March 2015. Retrieved 4 October 2026.
  6. “Environmental Assessment Report, Lawrence County Expansion Project (CP15-19)”. FERC. 27 January 2015. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.