Line 1485 Replacement Project

From the ProvenHand pipeline wiki

Line 1485 Replacement Project is a natural gas pipeline replacement in Pennsylvania, operated by Columbia Gas Transmission, LLC. Construction began in 2022. It runs 1.8 miles of 20" pipe.

Line 1485 Replacement Project
Also calledLine 1485 Replacement Line[1]
General information
KindPipeline project[1]
Project typeReplacement[2]
CommodityNatural gas[2]
Owner and operator
StatePennsylvania[1][2][4]
CountiesAllegheny, Washington[2][4]
Construction startedMarch 2022[5]
FERC docketCP21-499[3]
Contractors
Technical information
Length1.8 mi[4]
Pipe size20"[2][4]
Cost$23.3 million[2][4]
On ProvenHand
Hands listed0

Line 1485 Replacement Project is a natural gas pipeline replacement in Pennsylvania, operated by Columbia Gas Transmission, LLC. Construction began in 2022. It runs 1.8 miles of 20" pipe.

Contractorsedit

ContractorWorkScopeYears
Right-Of-Way Clearing & Maintenance, Inc.[1]Clearing and reclamationClearing; listed in 2022 as Allegheny and Washington Counties PA (CJ Hughes/TC Energy)until 1 January 2022

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line 1485 Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Projects”. Right-Of-Way Clearing & Maintenance, Inc. Retrieved 3 October 2026.
  2. “Notice of Request Under Blanket Authorization, Columbia Gas Transmission, LLC (CP21-499)”. Federal Energy Regulatory Commission. 4 October 2021. Retrieved 4 October 2026.
  3. “FERC eLibrary docket CP21-499”. Federal Energy Regulatory Commission. 23 September 2021. Retrieved 3 October 2026.
  4. “Environmental Assessment Report, Line 1485 Replacement Project (CP21-499)”. FERC. 9 December 2021. Retrieved 4 October 2026.
  5. “Weekly construction status report no. 001, Line 1485 Replacement Project, Columbia Gas Transmission, LLC (CP21-499)”. Federal Energy Regulatory Commission (eLibrary filing). 14 March 2022. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.