Line 1528 Upgrade Project

From the ProvenHand pipeline wiki

Line 1528 Upgrade Project is a natural gas pipeline replacement in Pennsylvania and West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2011. It runs 4.2 miles of 16" pipe.

Line 1528 Upgrade Project
General information
KindPipeline project[1]
Project typeReplacement[2]
StatusIn service[3]
CommodityNatural gas[2]
Owner and operator
StatesPennsylvania, West Virginia[2]
CountiesPennsylvania: Greene, Washington
West Virginia: Marshall
[2]
In service15 April 2011[3]
FERC docketCP10-439[4]
Technical information
Length4.2 mi[2]
Pipe size16"[2]
Cost$24,900,000[2]
On ProvenHand
Hands listed0

Line 1528 Upgrade Project is a natural gas pipeline replacement in Pennsylvania and West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2011. It runs 4.2 miles of 16" pipe.

Inspection

FirmScope
Tetra Tech, Inc.[3]FERC's contractor for the environmental compliance inspection of May 20, 2011

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line 1528 Upgrade Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Weekly Construction Status Report No. 1, Line 1528 Upgrade Project, Columbia Gas Transmission, LLC (CP10-439)”. Columbia Gas Transmission, LLC (filed with FERC). 12 November 2010. Retrieved 4 October 2026.
  2. “Environmental Assessment Report, Columbia Gas Transmission, LLC Line 1528 (CP10-439)”. FERC. 2 August 2010. Retrieved 4 October 2026.
  3. “Environmental Compliance Inspection Report, Line 1528 Upgrade Project (inspection of May 20, 2011), Columbia Gas Transmission, LLC (CP10-439)”. FERC. 9 June 2011. Retrieved 4 October 2026.
  4. “FERC eLibrary docket CP10-439”. Federal Energy Regulatory Commission. 20 May 2010. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.