Line KNY and KM3 Replacement Project is a natural gas pipeline replacement in New York, operated by National Fuel Gas Supply Corporation. It entered service in 2014. It runs 4.7 miles of 16", 20" pipe.

Line KNY and KM3 Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[1][2]
StatusApproved[2] or In service[3][sources disagree]
CommodityNatural gas[4]
Owner and operator
StateNew York[4]
CountiesCattaraugus, Erie[4]
In serviceOctober 2014[3]
FERC docketCP14-107[1]
Technical information
Length4.7 mi[4]
Pipe size16", 20"[4]
Cost$13,000,000[2]
On ProvenHand
Hands listed0

Line KNY and KM3 Replacement Project is a natural gas pipeline replacement in New York, operated by National Fuel Gas Supply Corporation. It entered service in 2014. It runs 4.7 miles of 16", 20" pipe.

Inspection

FirmScope
Tetra Tech, Inc.[3]FERC's contractor for the restoration inspection of October 16, 2015

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Status

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line KNY and KM3 Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP14-107”. Federal Energy Regulatory Commission. 14 March 2014. Retrieved 3 October 2026.
  2. “Environmental Assessment Report, Line KNY and KM3 Replacement Project, National Fuel Gas Supply Corporation (CP14-107)”. FERC. 21 May 2014. Retrieved 4 October 2026.
  3. “FERC Field Inspection Report, Lines KM3 and KNY Replacement Project (inspection of October 16, 2015), National Fuel Gas Supply Corporation (CP14-107)”. FERC. 17 December 2015. Retrieved 4 October 2026.
  4. “Notice of request under blanket authorization, National Fuel Gas Supply Corporation, Line KNY and KM3 Replacement Project (CP14-107)”. FERC. 24 March 2014. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.