Line P Replacement Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Line P Replacement Project is a pipeline replacement in Kentucky, operated by Columbia Gas Transmission, LLC.

Line P Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[2]
StatusUnder construction[3]
Owner and operator
StateKentucky[4]
CountiesJohnson, Lawrence[4]
FERC docketCP11-66[2]
Technical information
Length12 mi[1] or 11 mi[4][sources disagree]
Pipe size20"[1]
Capacity addedroughly 2,800 Dth per day (about 2.2% more capacity on Line P)[4]
Cost$25,000,000[1]
On ProvenHand
Hands listed0

Line P Replacement Project is a pipeline replacement in Kentucky, operated by Columbia Gas Transmission, LLC.

Inspection

FirmScope
Tetra Tech, Inc.[3]Third-party contractor to FERC performing a construction inspection of the project (FERC field inspection report of July 27, 2011)

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line P Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Environmental Assessment Report, Line P Replacement Project (CP11-66)”. FERC. 23 February 2011. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP11-66”. Federal Energy Regulatory Commission. 24 January 2011. Retrieved 3 October 2026.
  3. “FERC field inspection report (July 27, 2011), Line P Replacement Project (CP11-66)”. FERC (inspection by Tetra Tech, Inc. under contract to FERC). 26 August 2011. Retrieved 4 October 2026.
  4. “Advance notification of replacement of natural gas pipeline facilities (Section 2.55(b)), Line P Replacement Project (CP11-66)”. Columbia Gas Transmission, LLC (filed with FERC). 24 January 2011. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.