Lone Star Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Lone Star Project is a natural gas pipeline expansion, operated by Tennessee Gas Pipeline Company, L.L.C.. Construction began in 2018.
| Lone Star Project | |
|---|---|
| Also called | Lone Star Expansion[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Facility projects | |
| State | TX[1] or LA, MS, TX[2][sources disagree] |
| Counties | Jackson, San Patricio[3][4] |
| Approved | 15 December 2017[1][3] |
| Construction started | February 2018[5] |
| In service | 28 November 2018[2] or 1 December 2018[6][sources disagree] |
| FERC docket | CP16-496[1] |
| Technical information | |
| Capacity | 300 MMcf/d (FERC project list)[1][2] |
| Cost | $132 million (EIA estimate; no dollar year given)[2] or $90,416,876 actual and estimated to complete (May 2019); certificate estimate $131,928,100[7][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Lone Star Project is a natural gas pipeline expansion, operated by Tennessee Gas Pipeline Company, L.L.C.. Construction began in 2018.
Inspection
| Firm | Scope |
|---|---|
| Tetra Tech, Inc.[8][9] | Listed as FERC contractor staff on FERC construction inspections of Compressor Stations 3A and 11A (April and June 2018 reports) |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| In service | |
| States |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Lone Star Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate, Tennessee Gas Pipeline Company, L.L.C., Lone Star Project (CP16-496)”. Federal Energy Regulatory Commission. 15 December 2017. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, July 2018)”. Pipeline News. July 2018. Retrieved 3 October 2026.
- “Monthly Status Report (February 1-28, 2018), Lone Star Project (CP16-496)”. Tennessee Gas Pipeline Company, L.L.C. (filed with FERC). 7 March 2018. Retrieved 3 October 2026.
- “Notification of Actual In-Service Date, Lone Star Project (CP16-496)”. Tennessee Gas Pipeline Company, L.L.C. (filed with FERC). 6 December 2018. Retrieved 3 October 2026.
- “Cost Comparison, Lone Star Project (CP16-496)”. Tennessee Gas Pipeline Company, L.L.C. (filed with FERC). 28 May 2019. Retrieved 3 October 2026.
- “Construction Inspection Report (April 3, 2018 inspection), Lone Star Project (CP16-496)”. Federal Energy Regulatory Commission staff. 13 April 2018. Retrieved 3 October 2026.
- “Construction Inspection Report (June 6, 2018 inspection), Lone Star Project (CP16-496)”. Federal Energy Regulatory Commission staff. 21 June 2018. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.