Low Pressure East Upgrade Project
From the ProvenHand pipeline wiki
Low Pressure East Upgrade Project is a natural gas pipeline replacement in Pennsylvania, operated by Equitrans, L.P.. It runs 4.9 miles of 16", 20" pipe.
| Low Pressure East Upgrade Project | |
|---|---|
| General information | |
| Project type | Replacement[1] |
| Status | In service[2] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Pennsylvania[1] |
| Counties | Allegheny, Greene, Washington[1] |
| FERC docket | CP13-79[3] |
| Technical information | |
| Length | 4.9 mi[1] |
| Pipe size | 16", 20"[4] |
| Cost | $29,407,261[4] |
| On ProvenHand | |
| Hands listed | 0 |
Low Pressure East Upgrade Project is a natural gas pipeline replacement in Pennsylvania, operated by Equitrans, L.P.. It runs 4.9 miles of 16", 20" pipe.
Inspection
| Firm | Scope |
|---|---|
| Tetra Tech, Inc.[2] | FERC's contractor for the restoration inspection of July 23, 2015 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Low Pressure East Upgrade Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Notice of request under blanket authorization, Equitrans, LP, Low Pressure East Upgrade Project (CP13-79)”. FERC. 21 February 2013. Retrieved 4 October 2026.
- “FERC Field Inspection Report, Low Pressure East Upgrade Project (inspection of July 23, 2015), Equitrans, L.P. (CP13-79)”. FERC. 27 August 2015. Retrieved 4 October 2026.
- “FERC eLibrary docket CP13-79”. Federal Energy Regulatory Commission. 12 February 2013. Retrieved 3 October 2026.
- “Environmental Assessment Report, Low Pressure East Upgrade Project, Equitrans, L.P. (CP13-79)”. FERC. 19 April 2013. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.