M2E3 Project

From the ProvenHand pipeline wiki

M2E3 Project is a crude oil pipeline in Texas. It runs 500 miles of 36" pipe.

M2E3 Project
General information
KindPipeline project[1]
Project typeNew build[2]
CommodityCrude oil[2]
Owner
StateTexas[1]
Contractors
Technical information
Length500 mi[2]
Pipe size36"[2]
Capacityup to approximately 1 MMBPD[2]
On ProvenHand
Hands listed0

M2E3 Project is a crude oil pipeline in Texas. It runs 500 miles of 36" pipe.

Contractorsedit

ContractorWorkScopeSpreadYears
Rockford Corporation[1]PrimeSegments 4 and 7: 134 miles of 36-inch (Burnet and Houston TX); 26 HDDs, 188 bores, 15 mainline valvesuntil 1 January 2020
C.H. Fenstermaker & Associates[3]SurveyListed (as M2E3 & M2E4) among the projects of its pipeline survey and mapping services brochure
Pumpco, Inc.[4]PrimeIIR listing: Midland-to-ECHO 3 (502 miles of 30-inch, Midland to Sealy, TX): Troy Spreads 1-2, Pumpco Spreads 3 and 5A, Primoris Rockford Spreads 4 and 7, MPG Spreads 5-6; construction commenced Feb 2020, completion Dec 2020/Jan 2021Spread 3
Pumpco, Inc.[4]PrimeIIR listing: Spread 5A (see the Spread 3 entry)Spread 5A
Pumpco, Inc.[4]pump station contractor (five M2E3 pump stations, with NorthStar Energy Services as station G/C)IIR listing: five M2E3 pump-station entries (Stations 1-5: Midland, Big Lake, San Angelo, London, Austin areas; one 3,000-hp electric pump each) name Pumpco 'Pipeline G/C and Pump Station Contractor', NorthStar Energy Services station G/C; 2020

Spreads

SpreadPrime contractor
Segment 4[1]Rockford Corporation
Segment 7[1]Rockford Corporation
Spread 3[4]Pumpco, Inc.
Spread 5A[4]Pumpco, Inc.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on M2E3 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “M2E3 Project (Rockford project sheet)”. Primoris Services Corporation. Retrieved 3 October 2026.
  2. “Midland to ECHO Crude Oil and Condensate Pipeline Project (City of Taylor agenda item 12b, M2E-3 Pipeline presentation)”. Enterprise Products Partners L.P. (posted by the City of Taylor, TX). September 2019. Retrieved 4 October 2026.
  3. “Pipeline Services”. C.H. Fenstermaker & Associates. October 2023. Retrieved 4 October 2026.
  4. “Industrial Info Resources project report on the Whistler grassroot natural gas pipeline (Exhibit GPLDC-1b, South Dakota PUC docket HP22-001)”. Industrial Info Resources (as filed with the South Dakota Public Utilities Commission). 2023. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.