ML 3 Replacement Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
ML 3 Replacement Project is a natural gas pipeline replacement in Utah, operated by Questar Pipeline. It entered service in 2011.
| ML 3 Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1][2] |
| Status | Under construction[3] or In service[4][sources disagree] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Utah[2] |
| Counties | Morgan, Summit[2] |
| In service | 31 October 2011[4] |
| FERC docket | CP11-62[1] |
| Technical information | |
| Pipe size | 16"[2] |
| Cost | $16,210,000[2] |
| On ProvenHand | |
| Hands listed | 0 |
ML 3 Replacement Project is a natural gas pipeline replacement in Utah, operated by Questar Pipeline. It entered service in 2011.
Inspection
| Firm | Scope |
|---|---|
| Tetra Tech, Inc.[3] | FERC's contractor for the environmental compliance inspection of June 14 and 15, 2011 |
| NewEarth Ecological Consulting[3] | subcontractor to Tetra Tech that performed the FERC environmental compliance inspection of Segment 1 on June 14 and 15, 2011 |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on ML 3 Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP11-62”. Federal Energy Regulatory Commission. 20 January 2011. Retrieved 3 October 2026.
- “30-Day Advance Notification, ML 3 Replacement Project, Questar Pipeline Company (CP11-62)”. Questar Pipeline Company (filed with FERC). 20 January 2011. Retrieved 4 October 2026.
- “FERC Field Inspection Report, Questar Main Line 3 Replacement Project (inspection of June 14 and 15, 2011) (CP11-62)”. FERC. 1 July 2011. Retrieved 4 October 2026.
- “FERC Field Inspection Report (restoration inspection of September 17, 2012), Questar Main Line 3 Replacement Project (CP11-62)”. FERC. 10 October 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.