National Fuel Gas Supply Line YM28 and Line FM120 Modernization Project

From the ProvenHand pipeline wiki

National Fuel Gas Supply Line YM28 and Line FM120 Modernization Project is a natural gas pipeline expansion in Pennsylvania, operated by National Fuel Gas Supply Corporation. It entered service in 2018. It runs 20.2 miles of 6", 12" pipe.

National Fuel Gas Supply Line YM28 and Line FM120 Modernization Project
Also calledLine YM28 and Line FM120 Modernization Project[1]
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
StatePennsylvania[1]
Approved15 March 2018[3]
In service22 December 2018[1]
FERC docketCP17-74[1]
Technical information
Length20.2 mi[1]
Pipe size6", 12"[1]
Cost$39.5 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

National Fuel Gas Supply Line YM28 and Line FM120 Modernization Project is a natural gas pipeline expansion in Pennsylvania, operated by National Fuel Gas Supply Corporation. It entered service in 2018. It runs 20.2 miles of 6", 12" pipe.

Inspection

FirmScope
Tetra Tech, Inc.[4]FERC's third-party contractor on the Commission's construction/environmental inspections

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on National Fuel Gas Supply Line YM28 and Line FM120 Modernization Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP17-74”. Federal Energy Regulatory Commission. 10 March 2017. Retrieved 3 October 2026.
  3. “Notification that Line KL was placed into service, Line YM28 and Line FM120 Modernization Project (CP17-74)”. National Fuel Gas Supply Corporation (filed with FERC). 28 December 2018. Retrieved 4 October 2026.
  4. “Construction Inspection Report, Line YM28 and Line FM120 Modernization Project (CP17-74)”. Federal Energy Regulatory Commission. 30 November 2018. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.