National Fuel Gas Supply Line YM28 and Line FM120 Modernization Project is a natural gas pipeline expansion in Pennsylvania, operated by National Fuel Gas Supply Corporation. It entered service in 2018. It runs 20.2 miles of 6", 12" pipe.
| National Fuel Gas Supply Line YM28 and Line FM120 Modernization Project | |
|---|---|
| Also called | Line YM28 and Line FM120 Modernization Project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | Pennsylvania[1] |
| Approved | 15 March 2018[3] |
| In service | 22 December 2018[1] |
| FERC docket | CP17-74[1] |
| Technical information | |
| Length | 20.2 mi[1] |
| Pipe size | 6", 12"[1] |
| Cost | $39.5 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
National Fuel Gas Supply Line YM28 and Line FM120 Modernization Project is a natural gas pipeline expansion in Pennsylvania, operated by National Fuel Gas Supply Corporation. It entered service in 2018. It runs 20.2 miles of 6", 12" pipe.
Inspection
| Firm | Scope |
|---|---|
| Tetra Tech, Inc.[4] | FERC's third-party contractor on the Commission's construction/environmental inspections |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on National Fuel Gas Supply Line YM28 and Line FM120 Modernization Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP17-74”. Federal Energy Regulatory Commission. 10 March 2017. Retrieved 3 October 2026.
- “Notification that Line KL was placed into service, Line YM28 and Line FM120 Modernization Project (CP17-74)”. National Fuel Gas Supply Corporation (filed with FERC). 28 December 2018. Retrieved 4 October 2026.
- “Construction Inspection Report, Line YM28 and Line FM120 Modernization Project (CP17-74)”. Federal Energy Regulatory Commission. 30 November 2018. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.