NNG East Leg I Expansion

From the ProvenHand pipeline wiki

NNG East Leg I Expansion is a natural gas pipeline expansion in Iowa, operated by Northern Natural Gas Company. It entered service in 2008. It runs 8 miles of 6", 8", 30" pipe.

NNG East Leg I Expansion
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
StateIowa[1]
CountiesBoone, Bremer, Butler, Story[3]
In serviceNovember 2008[1]
FERC docketCP08-95[1]
Contractors
Technical information
Length8 mi[1]
Pipe size6", 8", 30"[1]
Capacity12.5 MMcf/d additional capacity (EIA)[1]
Cost$6.89 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

NNG East Leg I Expansion is a natural gas pipeline expansion in Iowa, operated by Northern Natural Gas Company. It entered service in 2008. It runs 8 miles of 6", 8", 30" pipe.

Contractorsedit

ContractorWorkSpreadYears
Infra Source Underground Services[3]PrimeEL1 Clarksville BL Loopfrom 9 June 2008
Michels Pipeline, Inc.[3]PrimeEL1 Ogden-Waterloo D-Line Extension
Infra Source Underground Services[3]PrimeEL1 Hawkeye Shell Rock Ethanol BL

Spreads

SpreadPrime contractorDates
EL1 Clarksville BL Loop[3]Infra Source Underground Servicesfrom 9 June 2008
EL1 Hawkeye Shell Rock Ethanol BL[3]Infra Source Underground Services
EL1 Ogden-Waterloo D-Line Extension[3]Michels Pipeline, Inc.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on NNG East Leg I Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP08-95”. Federal Energy Regulatory Commission. 18 March 2008. Retrieved 3 October 2026.
  3. “East Leg I prior-notice project weekly report, November 22-28, 2008 (CP08-95)”. Northern Natural Gas Company (filed with FERC). 2 December 2008. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.