Northwest Pipeline Capacity Replacement Project is a natural gas pipeline in Washington, operated by Northwest Pipeline LLC. It entered service in 2006.

Northwest Pipeline Capacity Replacement Project
Also calledNWPL Capacity Replacement Project[1]
General information
KindPipeline project[2]
Project typeExpansion[1] or Replacement[3][4][sources disagree]
StatusIn service[1]
CommodityNatural gas[1]
Owner and operator
StateWashington[1][2][4]
CountiesKing, Pierce, Skagit, Snohomish, Thurston, Whatcom[5]
Approved13 September 2005[2][4]
In serviceDecember 2006[1]
FERC docketCP05-32[2]
FERC pre-filing docketPF04-10[2]
Contractors
Technical information
Length79.5 mi[2][4] or 80 mi[1][sources disagree]
Pipe size26 in, 34 in[1] or 36 in[4][sources disagree]
Capacity360 MMcf/d additional capacity (EIA)[1]
Horsepower added10,760 hp[4]
Cost$333 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Northwest Pipeline Capacity Replacement Project is a natural gas pipeline in Washington, operated by Northwest Pipeline LLC. It entered service in 2006.

Contractorsedit

ContractorWorkScopeYears
Rockford Corporation[6]PrimeFt. Lewis Spread (22.5 miles of 36-inch, near Tacoma WA) and Snohomish Spread (11.8 miles of 36-inch, near Redmond WA)until 1 October 2006

Spreads

SpreadPrime contractor
Ft. Lewis Spread[6]Rockford Corporation
Snohomish Spread[6]Rockford Corporation

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Project type
Diameters
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Northwest Pipeline Capacity Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP05-32”. Federal Energy Regulatory Commission. 29 November 2004. Retrieved 3 October 2026.
  4. “Order Authorizing Abandonment and Issuing Certificate, Northwest Pipeline Corporation, Capacity Replacement Project (CP05-32)”. FERC. 13 September 2005. Retrieved 4 October 2026.
  5. “Letter order approving in-service request for the pipeline loops, Capacity Replacement Project (CP05-32)”. FERC (Office of Energy Projects). 16 October 2006. Retrieved 4 October 2026.
  6. “2006 Projects”. Rockford Corporation. Archived from the original on 7 December 2015. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.