Okeechobee Lateral

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Okeechobee Lateral is a natural gas pipeline lateral in Florida, operated by Florida Southeast Connection, LLC. Construction began in 2018. It runs 5.2 miles of 20" pipe.

Okeechobee Lateral
General information
KindPipeline project[1]
Project typeLateral[2][3]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateFlorida[1][2]
CountiesOkeechobee[4]
Approved30 May 2018[1]
Construction started7 June 2018[5]
In service30 August 2018[2] or 1 September 2018[6][sources disagree]
FERC docketCP17-463[1]
Contractors
Technical information
Length5.2 mi[1][2]
Pipe size20"[2]
Capacity400 MMcf/d (FERC project list)[1][2]
Cost$30.1 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Okeechobee Lateral is a natural gas pipeline lateral in Florida, operated by Florida Southeast Connection, LLC. Construction began in 2018. It runs 5.2 miles of 20" pipe.

Contractorsedit

ContractorWorkScopeYears
Rockford Corporation[7]Prime5.2 miles of 24-inch lateral with receiver, launcher and associated facilities in Okeechobee County, FL; listed start 3Q 2018, completion 1Q 20191 January 2018 – 1 January 2019
Rockford Corporation[8]PrimeListed 2018-2019 as the pipeline construction contractor

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 30 August 2018[2]
  • 1 September 2018[6]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Okeechobee Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP17-463”. Federal Energy Regulatory Commission. 14 June 2017. Retrieved 3 October 2026.
  4. “Notice of Request Under Blanket Authorization: Florida Southeast Connection, LLC (Docket No. CP17-463-000), Federal Register 2017-13599”. Federal Energy Regulatory Commission (published in the Federal Register). 29 June 2017. Retrieved 4 October 2026.
  5. “Notice of Commencement of Construction of Florida Southeast Connection, LLC under CP17-463”. Florida Southeast Connection, LLC (filed with FERC). 11 June 2018. Retrieved 4 October 2026.
  6. “Notification of Commencement of Service of Florida Southeast Connection, LLC under CP17-463”. Florida Southeast Connection, LLC (filed with FERC). 10 September 2018. Retrieved 4 October 2026.
  7. “Ongoing Projects: Construction Underway (Pipeline News, June 2018)”. Pipeline News. June 2018. Retrieved 3 October 2026.
  8. “Ongoing Projects: Construction Underway (Pipeline News, February 2019)”. Pipeline News. February 2019. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.