Paiute 2018 Expansion Project
From the ProvenHand pipeline wiki
Paiute 2018 Expansion Project is a natural gas pipeline expansion in Nevada, operated by Paiute Pipeline Company. It entered service in 2018. It runs 8.5 miles of 12", 20" pipe.
| Paiute 2018 Expansion Project | |
|---|---|
| Also called | 2018 Paiute Expansion Project[1], Paiute Pipeline Company's 2018 Expansion Project[2] |
| General information | |
| Kind | Pipeline project[1][3] |
| Project type | Expansion[2][3][4] |
| Status | In service[4] |
| Commodity | Natural gas[4][5] |
| Owners and operators | |
| State | Nevada[1][4][5] |
| Counties | Carson City, Douglas, Lyon[6] |
| Approved | 15 May 2018[1] |
| In service | 4 December 2018[4] |
| FERC dockets | CP17-471[1], CP18-536[3] |
| FERC pre-filing docket | PF17-2[1] |
| Contractors | |
| Technical information | |
| Length | 8.5 mi[1][4] |
| Pipe size | 12", 20"[4] |
| Capacity | 5.64 MMcf/d (FERC project list)[1] or 4.604 MMcf/d additional capacity (EIA)[4][sources disagree] |
| Capacity added | an additional 4,604 Dth/d[6] |
| Cost | $17.95 million (EIA estimate; no dollar year given)[4] |
| On ProvenHand | |
| Hands listed | 0 |
Paiute 2018 Expansion Project is a natural gas pipeline expansion in Nevada, operated by Paiute Pipeline Company. It entered service in 2018. It runs 8.5 miles of 12", 20" pipe.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Q&D Construction LLC[7] | Prime | Segments 1 and 4 (two of the four segments): about half a mile of 12-inch pipe in the Carson River Valley and about four miles of 20-inch loop near Fernley, NV; the EA gives Segment 1 as 0.42 mi of 12-inch and Segment 4 as 4.19 mi of 20-inch |
Inspection
| Firm | Scope |
|---|---|
| Tetra Tech, Inc.[8] | FERC's third-party contractor on the Commission's construction/environmental inspections |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Paiute 2018 Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC eLibrary docket CP17-471”. Federal Energy Regulatory Commission. 5 July 2017. Retrieved 3 October 2026.
- “FERC eLibrary docket CP18-536”. Federal Energy Regulatory Commission. 7 August 2018. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Advance Notification of Auxiliary Facility Installation, Paiute Pipeline Company (CP18-536)”. Paiute Pipeline Company (filed with FERC). 7 August 2018. Retrieved 4 October 2026.
- “Order Issuing Certificate and Approving Abandonment, Paiute Pipeline Company, 2018 Expansion Project (CP17-471)”. Federal Energy Regulatory Commission. 15 May 2018. Retrieved 4 October 2026.
- “Paiute (GBTCO) Pipeline Expansion Segments 1 and 4”. Q&D Construction. Retrieved 4 October 2026.
- “Construction Inspection Report, Paiute Pipeline Company 2018 Expansion Project (CP17-471)”. Federal Energy Regulatory Commission. 23 August 2018. Retrieved 4 October 2026.