Phase V Expansion

From the ProvenHand pipeline wiki

Phase V Expansion is a pipeline project in Alabama, Florida and Mississippi, operated by Florida Gas Transmission Company, LLC. It runs 231.1 miles.

Phase V Expansion
General information
KindPipeline project[1]
Owner and operator
StatesAlabama, Florida, Mississippi[1]
Approved27 July 2001[1]
FERC docketCP00-40[1]
Contractors
Technical information
Length231.1 mi[1]
Capacity269.7 MMcf/d (FERC project list)[1]
On ProvenHand
Hands listed0

Phase V Expansion is a pipeline project in Alabama, Florida and Mississippi, operated by Florida Gas Transmission Company, LLC. It runs 231.1 miles.

Contractorsedit

ContractorWorkScopeYears
Latex Construction[2]PrimePhase V loops: 45 mi of 20/26/30-in, Bradford to Volusia Cos., FL (Jan 2002); 74 mi of 18/30/36-in, Bay and Washington FL, Greene MS, Mobile and Baldwin AL (Apr 2002); 14 mi of 26-in and 34.9 mi of 36-in, Hillsborough to Levy Cos., FL (2003)until 1 January 2003

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Phase V Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “Latex Construction Company - Completed Projects (2005-2006 site)”. Latex Construction Company. Archived from the original on 27 November 2005. Retrieved 6 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.