Phase VII Expansion (Phase I and II
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Phase VII Expansion (Phase I and II is a natural gas pipeline in Florida, operated by Florida Gas Transmission Company, LLC. It entered service in 2007.
| Phase VII Expansion (Phase I and II | |
|---|---|
| Also called | FGT Phase VII Phase 1[1], Phase VII Expansion Project[2] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[3] or Expansion[2][sources disagree] |
| Status | In service[3][4] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| Operator | |
| State | Florida[1][3] |
| Approved | 15 June 2006[1][5] |
| In service | 22 December 2007[3] |
| FERC docket | CP06-1[1] |
| FERC pre-filing docket | PF05-11[1] |
| Contractors | |
| Technical information | |
| Length | 32.6 mi[1][5] or 17.3 mi[3][sources disagree] |
| Pipe size | 36"[3][5] |
| Capacity | 160 MMcf/d (FERC project list)[1] or 95 MMcf/d additional capacity (EIA)[3][sources disagree] |
| Horsepower added | 9,800 hp[5] |
| Cost | $63.5 million (EIA estimate; no dollar year given)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Phase VII Expansion (Phase I and II is a natural gas pipeline in Florida, operated by Florida Gas Transmission Company, LLC. It entered service in 2007.
Contractorsedit
| Contractor | Work | Scope | Spread |
|---|---|---|---|
| Latex Construction[6] | Prime | Phase VII Loop G: 6.48 miles of 36-inch in Hernando County, FL (field office Brooksville; current project on the 2006-2007 site) | Loop G |
| Latex Construction[6] | Prime | Phase VII Loop J: 5.0 miles of 36-inch in Gilchrist County, FL (field office Chiefland; current project on the 2006-2007 site) | Loop J |
Spreads
| Spread | Prime contractor |
|---|---|
| Loop G[6] | Latex Construction |
| Loop J[6] | Latex Construction |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Project type | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Phase VII Expansion (Phase I and II? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC eLibrary docket CP06-1”. Federal Energy Regulatory Commission. 5 October 2005. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Quarterly Post-Construction Activity Report No. 8 of 8 (final), Phase VII Expansion (CP06-1)”. Florida Gas Transmission Company, LLC (filed with FERC). 1 May 2009. Retrieved 4 October 2026.
- “Order issuing certificate(s), docket CP05-388: Order issuing certificates re Southern Natural Gas Company and Florida Gas Transmission Co”. Federal Energy Regulatory Commission. 15 June 2006. Retrieved 4 October 2026.
- “Latex Construction Company - Current Projects (2006-2007 site, captured June 2008)”. Latex Construction Company. Archived from the original on 6 June 2008. Retrieved 6 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.