Port Arthur LNG Trains 1-2 & Trains 3-4
From the ProvenHand pipeline wiki
Port Arthur LNG Trains 1-2 & Trains 3-4 is a facility project at Port Arthur LNG in Texas, operated by Port Arthur Lng, LLC. Construction began in 2023.
| Port Arthur LNG Trains 1-2 & Trains 3-4 | |
|---|---|
| Also called | Port Arthur Liquefaction Project[1] |
| General information | |
| Kind | Facility project[2] |
| Status | Under construction[3][4] |
| Owner | |
| Owner and operator | |
| Facility | Port Arthur LNG[3] |
| State | Texas[3] |
| Approved | 18 April 2019[2] |
| Construction started | March 2023[5] |
| FERC dockets | CP17-20[2], CP20-55[2] |
| FERC pre-filing docket | PF15-18[1] |
| Doe lng dockets | 15-53-LNG[6], 15-96-LNG[6], 18-162-LNG[6], 20-23-LNG[6] |
| Contractors | |
| Technical information | |
| Capacity added | 3.72 Bcfd (FERC LNG map, Sep 2026)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Port Arthur LNG Trains 1-2 & Trains 3-4 is a facility project at Port Arthur LNG in Texas, operated by Port Arthur Lng, LLC. Construction began in 2023.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Bechtel Energy[7] | Prime | Main contractor under the EPC agreement for Phase 1, two natural gas liquefaction trains at Port Arthur, TX | from 1 March 2023 |
| Bechtel Corporation[5] | Prime | EPC contractor; final notice to proceed to fully execute construction issued after FID (March 2023) | from 1 March 2023 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Port Arthur LNG Trains 1-2 & Trains 3-4? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP17-20”. Federal Energy Regulatory Commission. 29 November 2016. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
- “Monthly Status Report No. 86 (September 2026), Port Arthur Liquefaction Project (CP17-20)”. Port Arthur LNG, LLC (filed with FERC). 2 October 2026. Retrieved 4 October 2026.
- “Monthly Status Report No. 44 (March 2023), Port Arthur Liquefaction Project (CP17-20)”. Port Arthur LNG, LLC (filed with FERC). 5 April 2023. Retrieved 4 October 2026.
- “DOE: Long Term Applications Received by DOE to Export Domestically Produced LNG, CNG, CGL from the Lower-48 States (as of September 30, 2026)”. U.S. Department of Energy, Office of Fossil Energy and Carbon Management. 30 September 2026. Retrieved 3 October 2026.
- “Port Arthur LNG (project page)”. Bechtel. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.