Bechtel Energy
From the ProvenHand pipeline wiki
Bechtel Energy is a pipeline contractor.
| Bechtel Energy | |
|---|---|
| General information | |
| Industry | |
| Status | Active[4] |
| Website | www.bechtel.com[1] |
| PLCA | Member as of 3 October 2026[1] |
| On ProvenHand | |
| Hands listed | 0 |
Bechtel Energy is a pipeline contractor.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Scope | Years | Project built |
|---|---|---|---|---|
| Port Arthur LNG Trains 1-2 & Trains 3-4[3] | Prime | Main contractor under the EPC agreement for Phase 1, two natural gas liquefaction trains at Port Arthur, TX | from 1 March 2023 | 2023 |
| Sabine Pass Liquefaction Project[5] | Prime | Delivered six liquefaction trains: Trains 1 and 2 in 2016, Trains 3 and 4 in 2017, Train 5 in 2019, Train 6 and the third marine berth in 2022 | until 1 January 2022 | 2022 |
| Sabine Pass LNG Receiving Terminal[4] | Prime | Designed, built and expanded the original LNG receiving terminal at Sabine Pass between 2005 and 2009 | 1 January 2005 – 1 January 2009 | 2005 |
| Corpus Christi Liquefaction Midscale Trains 8 & 9 Project[6] | Prime | Midscale Trains 8 and 9 expansion at Corpus Christi: limited notice to proceed received ahead of the June 2025 final investment decision | ||
| Corpus Christi Stage III & T 8-9[6] | Prime | EPC execution of the Corpus Christi Stage 3 expansion: seven midscale LNG trains | ||
| Louisiana LNG[7][8] | Prime | EPC contractor for the initial development in Calcasieu Parish, LA: three LNG trains and two LNG storage tanks | from 1 May 2025 | |
| Rio Grande LNG[2][9] | Prime | Engineering, procurement and construction (lump-sum turnkey) for Phase 1: three liquefaction trains, two storage tanks and one marine berth at Brownsville, TX; notice to proceed issued to Bechtel Energy Inc. | from 12 July 2023 | |
| Sabine Pass Stage 5[4] | Prime | EPC contractor for Phase 1 of the Sabine Pass Expansion Project: design, construction and commissioning of Train 7 and supporting infrastructure; limited notice to proceed May 2026 | from 1 May 2026 | |
| Sabine Pass Stage 5[10] | Prime | Lump-sum turnkey EPC contract for Phase 1 (Train 7), signed 2026-05-28, with limited notice to proceed for early engineering and procurement | from 1 May 2026 |
References
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
- “Rio Grande LNG (project page)”. Bechtel. Retrieved 3 October 2026.
- “Port Arthur LNG (project page)”. Bechtel. Retrieved 3 October 2026.
- “Bechtel Greenlit for Sabine Pass Liquefaction Expansion in Southwest Louisiana (press release)”. Bechtel. 28 May 2026. Retrieved 3 October 2026.
- “Sabine Pass Liquefaction Project (project page)”. Bechtel. Retrieved 3 October 2026.
- “Corpus Christi Liquefaction Project (project page)”. Bechtel. Retrieved 3 October 2026.
- “Request for extension of time until December 31, 2029 to place the Louisiana LNG project in service (CP17-117 et al.)”. Louisiana LNG Infrastructure LLC et al. (filed with FERC). 13 May 2025. Retrieved 4 October 2026.
- “Louisiana LNG (project page)”. Bechtel. Retrieved 3 October 2026.
- “Request for three-year extension of time to complete and place in service all project facilities, Rio Grande LNG, LLC et al. (CP16-454 et al.)”. Rio Grande LNG, LLC et al. (filed with FERC). 24 April 2026. Retrieved 4 October 2026.
- “Sabine Pass expansion opportunities (Sabine Pass Stage 5 Expansion Project), Cheniere”. Cheniere Energy, Inc. Retrieved 4 October 2026.