Rio Grande LNG is a facility project at Rio Grande LNG in Texas, operated by Rio Grande LNG, LLC.
| Rio Grande LNG | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Status | Under construction[2][3] |
| Owner | |
| Owner and operator | |
| Facility | Rio Grande LNG[2] |
| State | Texas[2][5] |
| Counties | Cameron[5] |
| Approved | 22 November 2019[1][5] |
| FERC docket | CP16-454[1] |
| Doe lng docket | 15-190-LNG[6] |
| Contractors | |
| Technical information | |
| Capacity | total nominal capacity of 27 MTPA (five trains of 4.5 MTPA)[5] |
| Capacity added | 3.73 Bcfd (FERC LNG map, Sep 2026)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Rio Grande LNG is a facility project at Rio Grande LNG in Texas, operated by Rio Grande LNG, LLC.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Bechtel Energy[3][7] | Prime | Engineering, procurement and construction (lump-sum turnkey) for Phase 1: three liquefaction trains, two storage tanks and one marine berth at Brownsville, TX; notice to proceed issued to Bechtel Energy Inc. | from 12 July 2023 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Rio Grande LNG? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
- “Request for three-year extension of time to complete and place in service all project facilities, Rio Grande LNG, LLC et al. (CP16-454 et al.)”. Rio Grande LNG, LLC et al. (filed with FERC). 24 April 2026. Retrieved 4 October 2026.
- “FERC eLibrary docket CP16-454”. Federal Energy Regulatory Commission. 5 May 2016. Retrieved 3 October 2026.
- “Order Granting Authorizations under Sections 3 and 7 of the Natural Gas Act, Rio Grande LNG and Rio Bravo Pipeline (169 FERC 61,131, CP16-454 and CP16-455)”. FERC. 22 November 2019. Retrieved 3 October 2026.
- “DOE: Long Term Applications Received by DOE to Export Domestically Produced LNG, CNG, CGL from the Lower-48 States (as of September 30, 2026)”. U.S. Department of Energy, Office of Fossil Energy and Carbon Management. 30 September 2026. Retrieved 3 October 2026.
- “Rio Grande LNG (project page)”. Bechtel. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.