Sabine Pass Stage 5
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Sabine Pass Stage 5 is a facility project at Sabine Pass LNG.
| Sabine Pass Stage 5 | |
|---|---|
| Also called | Sabine Pass Stage 5 Expansion Project[1] |
| General information | |
| Kind | Facility project[1] |
| Status | Proposed[2][3][4][5] or Pre-filing[5][sources disagree] |
| Owners and operators | |
| Owner | |
| Part of | Sabine Crossing Pipeline Project[4] |
| Facility | Sabine Pass LNG[4] |
| State | LA[4] or LA, TX[6][sources disagree] |
| Counties | Louisiana: Cameron Texas: Chambers, Jefferson, Liberty[6] |
| FERC dockets | CP24-75[1], CP25-505[1] |
| FERC pre-filing docket | PF23-2[5] |
| Doe lng docket | 24-27-LNG[7] |
| Contractors | |
| Technical information | |
| Capacity added | 2.6 Bcfd (FERC LNG map, Sep 2026)[4] |
| LNG trains added | 3[2] |
| Liquefaction added | 19 MTPA[8] |
| On ProvenHand | |
| Hands listed | 0 |
Sabine Pass Stage 5 is a facility project at Sabine Pass LNG.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Bechtel Energy[9] | Prime | EPC contractor for Phase 1 of the Sabine Pass Expansion Project: design, construction and commissioning of Train 7 and supporting infrastructure; limited notice to proceed May 2026 | from 1 May 2026 |
| Bechtel Energy[10] | Prime | Lump-sum turnkey EPC contract for Phase 1 (Train 7), signed 2026-05-28, with limited notice to proceed for early engineering and procurement | from 1 May 2026 |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Status | |
| Operator | |
| States |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Sabine Pass Stage 5? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP24-75”. Federal Energy Regulatory Commission. 29 February 2024. Retrieved 3 October 2026.
- “Notice of Availability of the Final Environmental Impact Statement, Sabine Pass Stage 5 Expansion Project (CP24-75 et al., including CP25-506)”. FERC. 25 September 2026. Retrieved 4 October 2026.
- “Notice of Application and Establishing Intervention Deadline, Sabine Pass Liquefaction, LLC et al., Sabine Pass Stage 5 Expansion Project (CP24-75 et al.)”. FERC (eLibrary filing description). 18 June 2025. Retrieved 4 October 2026.
- “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
- “FERC eLibrary docket PF23-2”. Federal Energy Regulatory Commission. 22 February 2023. Retrieved 3 October 2026.
- “Notice of Scoping Period Requesting Comments on Environmental Issues for the Planned Sabine Pass Stage 5 Expansion Project, Sabine Pass Liquefaction, LLC et al. (PF23-2)”. FERC (public notice, eLibrary). 1 August 2024. Retrieved 4 October 2026.
- “DOE: Long Term Applications Received by DOE to Export Domestically Produced LNG, CNG, CGL from the Lower-48 States (as of September 30, 2026)”. U.S. Department of Energy, Office of Fossil Energy and Carbon Management. 30 September 2026. Retrieved 3 October 2026.
- “Federal Register notice of application and intervention deadline, Sabine Pass Liquefaction, Sabine Crossing and Cheniere Creole Trail (CP24-75 et al.)”. Federal Energy Regulatory Commission (Federal Register notice). 24 June 2025. Retrieved 4 October 2026.
- “Bechtel Greenlit for Sabine Pass Liquefaction Expansion in Southwest Louisiana (press release)”. Bechtel. 28 May 2026. Retrieved 3 October 2026.
- “Sabine Pass expansion opportunities (Sabine Pass Stage 5 Expansion Project), Cheniere”. Cheniere Energy, Inc. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.