Sabine Pass Stage 5

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Sabine Pass Stage 5 is a facility project at Sabine Pass LNG.

Sabine Pass Stage 5
Also calledSabine Pass Stage 5 Expansion Project[1]
General information
KindFacility project[1]
StatusProposed[2][3][4][5] or Pre-filing[5][sources disagree]
Owners and operators
Owner
Part ofSabine Crossing Pipeline Project[4]
FacilitySabine Pass LNG[4]
StateLA[4] or LA, TX[6][sources disagree]
CountiesLouisiana: Cameron
Texas: Chambers, Jefferson, Liberty
[6]
FERC docketsCP24-75[1], CP25-505[1]
FERC pre-filing docketPF23-2[5]
Doe lng docket24-27-LNG[7]
Contractors
Technical information
Capacity added2.6 Bcfd (FERC LNG map, Sep 2026)[4]
LNG trains added3[2]
Liquefaction added19 MTPA[8]
On ProvenHand
Hands listed0

Sabine Pass Stage 5 is a facility project at Sabine Pass LNG.

Contractorsedit

ContractorWorkScopeYears
Bechtel Energy[9]PrimeEPC contractor for Phase 1 of the Sabine Pass Expansion Project: design, construction and commissioning of Train 7 and supporting infrastructure; limited notice to proceed May 2026from 1 May 2026
Bechtel Energy[10]PrimeLump-sum turnkey EPC contract for Phase 1 (Train 7), signed 2026-05-28, with limited notice to proceed for early engineering and procurementfrom 1 May 2026

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Status
Operator
  • Sabine Pass Liquefaction Stage V, LLC[1][5]
  • Sabine Pass Liquefaction, LLC and Sabine Pass Liquefaction S[5]
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Sabine Pass Stage 5? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP24-75”. Federal Energy Regulatory Commission. 29 February 2024. Retrieved 3 October 2026.
  2. “Notice of Availability of the Final Environmental Impact Statement, Sabine Pass Stage 5 Expansion Project (CP24-75 et al., including CP25-506)”. FERC. 25 September 2026. Retrieved 4 October 2026.
  3. “Notice of Application and Establishing Intervention Deadline, Sabine Pass Liquefaction, LLC et al., Sabine Pass Stage 5 Expansion Project (CP24-75 et al.)”. FERC (eLibrary filing description). 18 June 2025. Retrieved 4 October 2026.
  4. “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
  5. “FERC eLibrary docket PF23-2”. Federal Energy Regulatory Commission. 22 February 2023. Retrieved 3 October 2026.
  6. “Notice of Scoping Period Requesting Comments on Environmental Issues for the Planned Sabine Pass Stage 5 Expansion Project, Sabine Pass Liquefaction, LLC et al. (PF23-2)”. FERC (public notice, eLibrary). 1 August 2024. Retrieved 4 October 2026.
  7. “DOE: Long Term Applications Received by DOE to Export Domestically Produced LNG, CNG, CGL from the Lower-48 States (as of September 30, 2026)”. U.S. Department of Energy, Office of Fossil Energy and Carbon Management. 30 September 2026. Retrieved 3 October 2026.
  8. “Federal Register notice of application and intervention deadline, Sabine Pass Liquefaction, Sabine Crossing and Cheniere Creole Trail (CP24-75 et al.)”. Federal Energy Regulatory Commission (Federal Register notice). 24 June 2025. Retrieved 4 October 2026.
  9. “Bechtel Greenlit for Sabine Pass Liquefaction Expansion in Southwest Louisiana (press release)”. Bechtel. 28 May 2026. Retrieved 3 October 2026.
  10. “Sabine Pass expansion opportunities (Sabine Pass Stage 5 Expansion Project), Cheniere”. Cheniere Energy, Inc. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.