Sabine Crossing Pipeline Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Sabine Crossing Pipeline Project is a natural gas pipeline in Louisiana and Texas, operated by Sabine Crossing, LLC. It runs 55.6 miles of 48" pipe.
| Sabine Crossing Pipeline Project | |
|---|---|
| Also called | Sabine Pass Stage 5 Expansion Project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] or New build[2][sources disagree] |
| Status | Pre-filing[2] or Proposed[3][sources disagree] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Operator | |
| Facility project | |
| States | Louisiana, Texas[2][4] |
| Counties | Louisiana: Cameron Texas: Chambers, Jefferson, Liberty[3] |
| FERC dockets | CP24-75[1], CP25-505[1] |
| Technical information | |
| Length | 55.6 mi[2][3][4] |
| Pipe size | 48"[2][3] |
| Capacity | 2700 MMcf/d (FERC project list)[4] or 2500 MMcf/d additional capacity (EIA)[2] or deliver up to 2.7 Bcf/d of natural gas[6][sources disagree] |
| Horsepower added | 210,000 hp[6] |
| Cost | estimates the total cost ... to be $1,626,222,797[6] |
| On ProvenHand | |
| Hands listed | 0 |
Sabine Crossing Pipeline Project is a natural gas pipeline in Louisiana and Texas, operated by Sabine Crossing, LLC. It runs 55.6 miles of 48" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Project type | |
| Status |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Sabine Crossing Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP24-75”. Federal Energy Regulatory Commission. 29 February 2024. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Availability of the Final Environmental Impact Statement, Sabine Pass Stage 5 Expansion Project (CP24-75 et al., including CP25-506)”. FERC. 25 September 2026. Retrieved 4 October 2026.
- “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
- “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
- “Federal Register notice of application and intervention deadline, Sabine Pass Liquefaction, Sabine Crossing and Cheniere Creole Trail (CP24-75 et al.)”. Federal Energy Regulatory Commission (Federal Register notice). 24 June 2025. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.