Sabine Crossing Pipeline Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Sabine Crossing Pipeline Project is a natural gas pipeline in Louisiana and Texas, operated by Sabine Crossing, LLC. It runs 55.6 miles of 48" pipe.

Sabine Crossing Pipeline Project
Also calledSabine Pass Stage 5 Expansion Project[1]
General information
KindPipeline project[1]
Project typeExpansion[1] or New build[2][sources disagree]
StatusPre-filing[2] or Proposed[3][sources disagree]
CommodityNatural gas[2]
Owner and operator
Operator
Facility project
StatesLouisiana, Texas[2][4]
CountiesLouisiana: Cameron
Texas: Chambers, Jefferson, Liberty
[3]
FERC docketsCP24-75[1], CP25-505[1]
Technical information
Length55.6 mi[2][3][4]
Pipe size48"[2][3]
Capacity2700 MMcf/d (FERC project list)[4] or 2500 MMcf/d additional capacity (EIA)[2] or deliver up to 2.7 Bcf/d of natural gas[6][sources disagree]
Horsepower added210,000 hp[6]
Costestimates the total cost ... to be $1,626,222,797[6]
On ProvenHand
Hands listed0

Sabine Crossing Pipeline Project is a natural gas pipeline in Louisiana and Texas, operated by Sabine Crossing, LLC. It runs 55.6 miles of 48" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 2700 MMcf/d (FERC project list)[4]
  • 2500 MMcf/d additional capacity (EIA)[2]
  • deliver up to 2.7 Bcf/d of natural gas[6]
Project type
Status

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Sabine Crossing Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP24-75”. Federal Energy Regulatory Commission. 29 February 2024. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notice of Availability of the Final Environmental Impact Statement, Sabine Pass Stage 5 Expansion Project (CP24-75 et al., including CP25-506)”. FERC. 25 September 2026. Retrieved 4 October 2026.
  4. “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
  5. “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
  6. “Federal Register notice of application and intervention deadline, Sabine Pass Liquefaction, Sabine Crossing and Cheniere Creole Trail (CP24-75 et al.)”. Federal Energy Regulatory Commission (Federal Register notice). 24 June 2025. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.