Rockport Compressor Station Replacement Project is a natural gas facility project in West Virginia, operated by Columbia Gas Transmission, LLC.
| Rockport Compressor Station Replacement Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Rebuild[1] |
| Status | Under construction[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | West Virginia[3] |
| Counties | Wood[3] |
| Approved | 8 May 2013[4] |
| FERC docket | CP13-81[1] |
| Technical information | |
| Units added | 2 (compressor unit)[5] |
| Cost | $22,000,000[5] |
| On ProvenHand | |
| Hands listed | 0 |
Rockport Compressor Station Replacement Project is a natural gas facility project in West Virginia, operated by Columbia Gas Transmission, LLC.
Inspection
| Firm | Scope |
|---|---|
| Tetra Tech, Inc.[2] | FERC's contractor for the construction inspection of June 4, 2014 |
| NewEarth Ecological Consulting[2] | subcontractor to Tetra Tech that performed the FERC construction inspection of June 4, 2014 (the report spells it 'NewEarth Ecological') |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Rockport Compressor Station Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP13-81”. Federal Energy Regulatory Commission. 21 February 2013. Retrieved 3 October 2026.
- “FERC Field Inspection Report, Rockport Compressor Station Replacement Project (inspection of June 4, 2014), Columbia Gas Transmission, LLC (CP13-81)”. FERC. 17 June 2014. Retrieved 4 October 2026.
- “Notice of Request under Blanket Authorization, Columbia Gas Transmission, LLC (CP13-81)”. FERC. 7 March 2013. Retrieved 4 October 2026.
- “Letter order granting extension of time to May 8, 2015, Rockport Compressor Station Replacement Project, Columbia Gas Transmission, LLC (CP13-81)”. FERC. 8 May 2014. Retrieved 4 October 2026.
- “Environmental Assessment Report, Rockport Compressor Station Replacement Project, Columbia Gas Transmission, LLC (CP13-81)”. FERC. 6 May 2013. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.