Ruby Pipeline is a natural gas pipeline in Wyoming, Utah, Nevada and Oregon, operated by El Paso. Construction began in 2010 and the line entered service in 2011.[1]
| Ruby Pipeline | |
|---|---|
| Also called | Ruby |
| General information | |
| Project type | New build[4] |
| Status | In service[4] |
| Commodity | Natural gas[4] |
| Operator | El Paso |
| Owner and operator | |
| States | Wyoming, Utah, Nevada, Oregon[4][5] |
| Approved | 5 April 2010[5] |
| Construction started | 2010 |
| In service | 28 July 2011[4] |
| FERC docket | CP09-54[5] |
| FERC pre-filing docket | PF08-9[5] |
| Contractors | |
| Technical information | |
| Length | 680 mi or 677.8 mi[5] or 672.5 mi[4][sources disagree] |
| Pipe size | 42"[4] |
| Capacity | 1456 MMcf/d (FERC project list)[5] or 1500 MMcf/d additional capacity (EIA)[4][sources disagree] |
| Cost | $2960 million (EIA estimate; no dollar year given)[4] |
| On ProvenHand | |
| Hands listed | 0 |
Ruby Pipeline is a natural gas pipeline in Wyoming, Utah, Nevada and Oregon, operated by El Paso. Construction began in 2010 and the line entered service in 2011.[1]
Contractorsedit
| Contractor | Work | Prime or sub | Scope | Spread | Years |
|---|---|---|---|---|---|
| U.S. Pipeline[1] | Sections 1 (123 mi) and 3 (120 mi) | ||||
| Associated Pipe Line Contractors[1] | Section 2 (51 mi) | ||||
| Precision Pipeline[1] | Sections 4 (109 mi) and 5 (146 mi) | ||||
| Rockford Corporation[1] | Sections 6 (66 mi) and 7 (60 mi) | ||||
| Hoover Construction Company[6][7] | Rock drilling and blasting | Pipeline rock drilling and blasting, Spread 3 (Utah and Nevada) | Spread 3 | 1 January 2010 – 1 January 2011 | |
| Hoover Construction Company[8][9] | Rock drilling and blasting | Pipeline rock drilling and blasting, Spread 4 (Nevada) | Spread 4 | 1 January 2010 – 1 January 2011 | |
| U.S. Pipeline, Inc.[10] | Prime | 241 miles of 42-inch in Wyoming, Utah and Nevada | 1 January 2010 | ||
| Rockford Corporation[11][12][13] | Prime | Spreads 6 and 7: 127 miles of 42-inch, Vya NV to Malin OR | 1 June 2010 – 1 January 2011 | ||
| Hoover Construction Company[14] | Rock drilling and blasting | Pipeline rock drilling and blasting, Spread 1b (Utah) | Spread 1b | 1 January 2011 | |
| Pedero Pipe Support Systems USA[15] | Pipeline foam (trench breakers and pillows) | Under Rockford Corporation | Pillows and breakers, 110 M of 36-inch (as written on the page) | ||
| Precision Pipeline, LLC[16] | Prime | Spread 4: 256 miles of 42-inch, Nevada | until 1 January 2010 | ||
| Pe Ben USA, Inc.[17] | Pipe hauling | Pipe logistics; listed under client El Paso as Ruby Pipeline (2012 page, recently completed) |
Pipe mills
| Mill | Diameter | Grade |
|---|---|---|
| Borusan Berg Pipe[18] | 42 in | X70 |
| Welspun Corp Ltd.[19] | X70 |
Spreads
| Spread | Prime contractor |
|---|---|
| Spread 1b[14] | |
| Spread 3[6] | |
| Spread 4[8][16] | Precision Pipeline, LLC |
| Spread 6[11] | Rockford Corporation |
| Spread 7[11] | Rockford Corporation |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Ruby Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- offshore-technology.com
- eia.gov
- rextag.com
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “2010 Ruby Pipeline Spread 3 (Utah and Nevada) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
- “2011 Ruby Pipeline Blasting Spread 3 (Utah and Nevada) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
- “2010 Ruby Pipeline Spread 4 (Nevada) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
- “2011 Ruby Pipeline Spread 4 (Nevada) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
- “Recent Projects table, 2000-2010 (archive 2011-12-07)”. U.S. Pipeline, Inc. Archived from the original on 7 December 2011. Retrieved 6 October 2026.
- “Ruby Project (Rockford project sheet)”. Primoris Services Corporation. Retrieved 3 October 2026.
- “Primoris Services Corporation to acquire Rockford Corporation (press release, Form 8-K exhibit 99.1)”. Primoris Services Corporation. 9 November 2010. Retrieved 3 October 2026.
- “PROJECTS”. Rockford Corporation. Archived from the original on 6 November 2016. Retrieved 3 October 2026.
- “2011 Ruby Pipeline Spread 1b (Utah) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
- “Ruby Pipeline in Lakeview, OR – Pedero”. Pedero Pipe Support Systems USA. Archived from the original on 3 March 2017. Retrieved 3 October 2026.
- “All Projects - Precision Pipeline, LLC | Infrastructure and Utility Pipeline Contractor”. Precision Pipeline, LLC. Retrieved 3 October 2026.
- “Clients | About Us | Pe Ben USA”. Pe Ben USA, Inc. Archived from the original on 25 January 2012. Retrieved 3 October 2026.
- “Borusan Berg Pipe - Selected Projects”. Borusan Berg Pipe. Retrieved 3 October 2026.
- “Welspun Corp | Projects”. Welspun Corp Ltd. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.