SE Mkt P/L Proj is a pipeline project in Alabama, Florida and Georgia, operated by Sabal Trail Transmission. Construction began in 2016. It runs 516.2 miles.
| SE Mkt P/L Proj | |
|---|---|
| Also called | Sabal Trail Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Owner and operator | |
| Facility project | |
| States | Alabama, Florida, Georgia[2] |
| Approved | 2 February 2016[2] |
| Construction started | 19 August 2016[4] |
| FERC docket | CP15-17[2] |
| FERC pre-filing docket | PF14-1[2] |
| Contractors | |
| Technical information | |
| Length | 516.2 mi[2] |
| Capacity | 1075 MMcf/d (FERC project list)[2] |
| On ProvenHand | |
| Hands listed | 0 |
SE Mkt P/L Proj is a pipeline project in Alabama, Florida and Georgia, operated by Sabal Trail Transmission. Construction began in 2016. It runs 516.2 miles.
Contractorsedit
| Contractor | Work | Scope | Spread |
|---|---|---|---|
| Rockford Corporation[5] | Prime | Spread 6 (awarded): 79.3 miles of 36-inch pipe, including 5 directional drills, 40 road bores and over 7 miles of push/pull work in Florida marsh | Spread 6 |
Spreads
| Spread | Prime contractor |
|---|---|
| Spread 6[5] | Rockford Corporation |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on SE Mkt P/L Proj? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP15-17”. Federal Energy Regulatory Commission. 21 November 2014. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Request to place the Hunter's Creek Line in service, Sabal Trail Project (CP15-17)”. Sabal Trail Transmission, LLC (filed with FERC). 20 July 2018. Retrieved 4 October 2026.
- “Notice of Commencement of Construction, Sabal Trail Project (CP15-17)”. Sabal Trail Transmission, LLC (filed with FERC). 29 August 2016. Retrieved 4 October 2026.
- “PROJECTS”. Rockford Corporation. Archived from the original on 6 November 2016. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.