SNG Lateral is a natural gas pipeline lateral in Louisiana, operated by Acadian Gas Pipeline System. It entered service in 2011.

SNG Lateral
General information
KindPipeline project[1]
Project typeLateral[1][2]
StatusIn service[3]
CommodityNatural gas[1][4]
Owner and operator
StateLouisiana[1][4]
CountiesIberville[1][4]
In service21 October 2011[3]
FERC docketCP11-163[2]
Contractors
Technical information
Length5.5 mi[1][4] or 5.6 mi[3][sources disagree]
Pipe size24"[1][4]
Capacitydesign capacity of 400 MMcf/d[1]
Cost$21.8 million estimated, excluding capitalized labor[1]
On ProvenHand
Hands listed0

SNG Lateral is a natural gas pipeline lateral in Louisiana, operated by Acadian Gas Pipeline System. It entered service in 2011.

Contractorsedit

ContractorWork
PBS&J[1]Environmental consultant: prepared the advance notification and its agency consultations

Inspection

FirmScope
Tetra Tech, Inc.[5]Third-party contractor to FERC performing environmental inspections of the laterals (FERC field inspection reports of July 13, 2011 and May 21, 2012)

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on SNG Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Advance notification of construction of facilities (Section 284.11(b)), SNG Lateral (CP11-163)”. Acadian Gas Pipeline System (filed with FERC). 31 March 2011. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP11-163”. Federal Energy Regulatory Commission. 31 March 2011. Retrieved 3 October 2026.
  3. “FERC field inspection report (May 21, 2012), Acadian Gas Petrologistics Lateral and SNG Lateral Projects (CP11-162, CP11-163)”. FERC (inspection by Tetra Tech, Inc. under contract to FERC). 13 July 2012. Retrieved 4 October 2026.
  4. “Environmental Assessment Report, SNG Lateral (CP11-163)”. FERC. 29 April 2011. Retrieved 4 October 2026.
  5. “FERC field inspection report (July 13, 2011), Acadian Gas Petrologistics and SNG Lateral Projects (CP11-162, CP11-163)”. FERC (inspection by Tetra Tech, Inc. under contract to FERC). 26 August 2011. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.