Three Rivers Interconnection Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Three Rivers Interconnection Project is a natural gas pipeline lateral in Illinois, operated by Alliance Pipeline L.P.. Construction began in 2024.

Three Rivers Interconnection Project
Also calledRelated Authorizations for Three Rivers Interconnection Project[1]
General information
KindPipeline project[2]
Project typeLateral[3]
StatusIn service[3][4]
CommodityNatural gas[3]
Owner and operator
StateIllinois[2][3]
CountiesGrundy[5]
Approved17 March 2023[2][5]
Construction started28 March 2024[6]
In service16 September 2024[3] or 30 September 2024[4][sources disagree]
FERC docketCP21-113[2]
Contractors
Technical information
Length2.8 mi[2][3] or 2.9 mi[5][sources disagree]
Pipe size20"[3][5]
Capacity210 MMcf/d (FERC project list)[2][3]
Cost$27.7 million (EIA estimate; no dollar year given)[3][5]
On ProvenHand
Hands listed0

Three Rivers Interconnection Project is a natural gas pipeline lateral in Illinois, operated by Alliance Pipeline L.P.. Construction began in 2024.

Contractorsedit

ContractorWorkScope
North Country Directional Drilling, LLC[7]HDD and boreFour 20-inch steel HDD crossings in Grundy County IL, including a hard-rock bore under the Illinois River

Inspection

Crossings

FeatureMethodContractor
Illinois River[7][9]HDDNorth Country Directional Drilling, LLC
Illinois and Michigan Canal[9]HDD
Lock Road[9]HDD
Railroad[9]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 16 September 2024[3]
  • 30 September 2024[4]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Three Rivers Interconnection Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP21-113”. Federal Energy Regulatory Commission. 1 April 2021. Retrieved 3 October 2026.
  2. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  4. “Notice of Commencement of Service, Three Rivers Interconnection Project (CP21-113)”. Alliance Pipeline L.P. (filed with FERC). 3 October 2024. Retrieved 4 October 2026.
  5. “Order Issuing Certificate, Alliance Pipeline L.P., Three Rivers Interconnection Project (CP21-113)”. Federal Energy Regulatory Commission. 17 March 2023. Retrieved 4 October 2026.
  6. “Bi-Weekly Status Report No. 1, Three Rivers Interconnection Project (CP21-113)”. Alliance Pipeline L.P. (filed with FERC). 25 April 2024. Retrieved 4 October 2026.
  7. “HDD Project Videos & Press Coverage | NCDD”. North Country Directional Drilling, LLC. Retrieved 3 October 2026.
  8. “Construction Inspection Report (inspection of 05/21/2024), Three Rivers Interconnection Project (CP21-113)”. Federal Energy Regulatory Commission. 13 June 2024. Retrieved 4 October 2026.
  9. “Request for Notice to Proceed with Construction, Three Rivers Interconnection Project (CP21-113)”. Alliance Pipeline L.P. (filed with FERC). 5 March 2024. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.