TL-400 Pipeline Replacement Project

From the ProvenHand pipeline wiki

TL-400 Pipeline Replacement Project is a natural gas pipeline replacement in Ohio, operated by Dominion Transmission, Inc..

TL-400 Pipeline Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[2][3]
StatusIn service[4]
CommodityNatural gas[3]
Operator
Owner and operator
StateOhio[3]
CountiesFairfield[3]
FERC docketCP11-71[2]
Technical information
Pipe size26"[3]
Cost$10,991,260[1]
On ProvenHand
Hands listed0

TL-400 Pipeline Replacement Project is a natural gas pipeline replacement in Ohio, operated by Dominion Transmission, Inc..

Inspection

FirmScope
Tetra Tech, Inc.[5]FERC's contractor for the environmental compliance inspection of June 2, 2011

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on TL-400 Pipeline Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “TL-400 Pipeline Replacement Project, 60-Day Prior Notice, Dominion Transmission, Inc. (CP11-71)”. Dominion Transmission, Inc. (filed with FERC). 28 January 2011. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP11-71”. Federal Energy Regulatory Commission. 28 January 2011. Retrieved 3 October 2026.
  3. “Notice of Request under Blanket Authorization, Dominion Transmission, Inc. (CP11-71)”. FERC. 14 February 2011. Retrieved 4 October 2026.
  4. “Environmental Weekly Progress Report, August 29 - September 5, 2011, TL-400 Replacement Project, Dominion Transmission, Inc. (CP11-71)”. Dominion Transmission, Inc. (filed with FERC). 21 September 2011. Retrieved 4 October 2026.
  5. “FERC Field Inspection Report, TL-400 Replacement Project (inspection of June 2, 2011), Dominion Transmission, Inc. (CP11-71)”. FERC. 20 June 2011. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.