Transco Southeast Supply Enhancement

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Transco Southeast Supply Enhancement is a natural gas pipeline expansion, operated by Williams (Transco). Construction began in 2026.[1]

Transco Southeast Supply Enhancement
Also calledSoutheast Supply Enhancement Project[6], SSEP, SESE, Eden Loop, Salem Loop
General information
Project typeExpansion[4]
StatusUnder construction[4]
CommodityNatural gas[4]
OperatorWilliams (Transco)
Owner and operator
Facility projects
StatesVA, NC or AL, GA, NC, VA[7][8] or AL, GA, NC, SC, VA[4][sources disagree]
CountiesAlabama: Coosa
Georgia: Henry, Walton

North Carolina: Cleveland, Davidson, Forsyth, Gaston, Guilford, Iredell, Lincoln, Rockingham

South Carolina: Anderson

Virginia: Pittsylvania
[9]
Approved5 March 2025[7] or 29 January 2026[9][sources disagree]
Construction started2 March 2026[10]
FERC docketCP25-10[6]
FERC pre-filing docketPF24-2[6]
Contractors
Technical information
Length55.3 mi[4] or 54.9 mi[7][8][sources disagree]
Pipe size42"[4]
Wall thickness0.74 and 0.89 in[5]
GradeX70[5]
WeldingMechanized[5]
Capacity1597 MMcf/d (FERC project list)[7][8] or 1600 MMcf/d additional capacity (EIA)[4][sources disagree]
Cost$1530 million (EIA estimate; no dollar year given)[4]
On ProvenHand
Hands listed0

Transco Southeast Supply Enhancement is a natural gas pipeline expansion, operated by Williams (Transco). Construction began in 2026.[1]

Contractorsedit

ContractorWorkPrime or subScopeSpreadYears
Associated Pipe Line Contractors[5]Eden and Salem loops
Associated Pipe Line Contractors, Inc.[11]PrimeSalem Loop, 24.1 miles of 42-inch for Williams/Transco (Local 798 pre-job 17211 dated 2026-03-17, approx. completion 2026-10-10)Salem Loopfrom 1 January 2026
Associated Pipe Line Contractors, Inc.[11]PrimeEden Loop, 30.42 miles of 42-inch for Williams/Transco (Local 798 pre-job 17211 dated 2026-03-17, approx. completion 2026-10-10)Eden Loopfrom 1 January 2026
Hoover Construction Company[12]Rock drilling and blastingUnder Associated Pipe Line Contractors, Inc.Drilling and blasting on 52 miles of 42-inch in Guilford, Forsyth, Davidson and Rockingham Counties, NC, and Pittsylvania County, VA (the Salem and Eden loops)from 23 March 2026
Associated Pipe Line Contractors, Inc.[5][11]PrimeEden and Salem loops
RMS Welding Systems[5]Mechanized weldingUnder Associated Pipe Line Contractors, Inc.mechanized welding system (MOWII) for the Eden and Salem loops

Spreads

SpreadPrime contractorDates
Eden Loop[5][9][10][11]Associated Pipe Line Contractors, Inc.from 2 March 2026
Salem Loop[5][9][10][11]Associated Pipe Line Contractors, Inc.from 2 March 2026

Crossings

FeatureMethod
Cascade Creek[13]HDD
Interstate 40[14]HDD
Linville Lake[14]HDD
Sandy River[13]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Approved
  • 5 March 2025[7]
  • 29 January 2026[9]
Capacity
  • 1597 MMcf/d (FERC project list)[7][8]
  • 1600 MMcf/d additional capacity (EIA)[4]
Length
States
  • VA, NC (on this page, no source given)
  • AL, GA, NC, VA[7][8]
  • AL, GA, NC, SC, VA[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Transco Southeast Supply Enhancement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. pgjonline.com
  2. marcellusdrilling.com
  3. williams.com
  4. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  5. “Projects (MOWII)”. RMS Welding Systems. Retrieved 3 October 2026.
  6. “FERC eLibrary docket CP25-10”. Federal Energy Regulatory Commission. 29 October 2024. Retrieved 3 October 2026.
  7. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  8. “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
  9. “Order Issuing Certificate and Approving Abandonment, Transcontinental Gas Pipe Line Company, LLC, Southeast Supply Enhancement Project (CP25-10)”. Federal Energy Regulatory Commission. 29 January 2026. Retrieved 3 October 2026.
  10. “Biweekly Construction Status Report for 03/02/2026 to 03/15/2026, Southeast Supply Enhancement Project (CP25-10)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 20 March 2026. Retrieved 3 October 2026.
  11. “Pre-job list (job 17211: Williams/Transco Salem Loop and Eden Loop), Pipeliners Local Union 798”. Pipeliners Local Union 798. March 2026. Retrieved 3 October 2026.
  12. “Hoover Construction job notice: Associated Pipeline Contractors, North Carolina (dated 2026-03-23)”. Teamsters National Pipeline. 23 March 2026. Retrieved 6 October 2026.
  13. “Biweekly Construction Status Report for 03/16/2026 to 03/29/2026, Southeast Supply Enhancement Project (CP25-10)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 6 April 2026. Retrieved 3 October 2026.
  14. “Biweekly Construction Status Report for 08/17/2026 to 08/30/2026, Southeast Supply Enhancement Project (CP25-10)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 22 September 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.