Transco to Charleston Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Transco to Charleston Project is a natural gas pipeline expansion in South Carolina, operated by Dominion Carolina Gas Transmission, LLC. Construction began in 2017 and the line entered service in 2018.

Transco to Charleston Project
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateSouth Carolina[1][2]
CountiesCharleston, SC; Dillon, SC; Lexington, SC; Marlboro, SC[3] or Aiken, SC; Charleston, SC; Dillon, SC; Dorchester, SC; Greenwood, SC; Laurens, SC; Newberry, SC; Spartanburg, SC[4][sources disagree]
Approved2 February 2017[1][4]
Construction startedApril 2017[5]
In service27 February 2018[2]
FERC docketCP16-98[1]
FERC pre-filing docketPF15-29[1]
Technical information
Length60 mi[1] or 55 mi[2][sources disagree]
Pipe size12 in[2] or 4 in, 12 in[4][sources disagree]
Capacity80 MMcf/d (FERC project list)[1][2]
Capacity added80,000 Dth/d of firm transportation service[4]
Cost$119 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Transco to Charleston Project is a natural gas pipeline expansion in South Carolina, operated by Dominion Carolina Gas Transmission, LLC. Construction began in 2017 and the line entered service in 2018.

Inspection

FirmScope
Tetra Tech, Inc.[6]FERC's third-party contractor on the Commission's construction/environmental inspections

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Counties
  • Charleston, SC; Dillon, SC; Lexington, SC; Marlboro, SC[3]
  • Aiken, SC; Charleston, SC; Dillon, SC; Dorchester, SC; Greenwood, SC; Laurens, SC; Newberry, SC; Spartanburg, SC[4]
Diameters
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Transco to Charleston Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Ongoing Projects: Construction Underway (Pipeline News, September 2017)”. Pipeline News. September 2017. Retrieved 3 October 2026.
  4. “Order Issuing Certificate, Dominion Carolina Gas Transmission, LLC, Transco to Charleston Project (CP16-98)”. Federal Energy Regulatory Commission. 2 February 2017. Retrieved 4 October 2026.
  5. “Bi-weekly Status Report (4.1.17 to 4.14.17), Transco to Charleston Project (CP16-98)”. Dominion Carolina Gas Transmission, LLC (filed with FERC). 21 April 2017. Retrieved 4 October 2026.
  6. “Construction Inspection Report, Transco to Charleston Project (CP16-98)”. Federal Energy Regulatory Commission. 19 September 2017. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.