Traverse Pipeline
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Traverse Pipeline is a natural gas pipeline in Texas, operated by WhiteWater.[1]
| Traverse Pipeline | |
|---|---|
| Also called | Traverse |
| General information | |
| Project type | New build[1] |
| Status | Under construction[1] |
| Commodity | Natural gas[1] |
| Operator | WhiteWater |
| Operators | |
| Pipeline system | Traverse Pipeline[5] |
| State | Texas[1] |
| Counties | Calhoun, Jackson, Nueces, Refugio, San Patricio, Victoria, Wharton[5] |
| Contractors | |
| Technical information | |
| Length | 152 mi[1] or 160 mi[4][sources disagree] |
| Pipe size | 42"[1][6] |
| Capacity | 2400 MMcf/d additional capacity (EIA)[1] or bi-directional 2.5 Bcf/d[7][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Traverse Pipeline is a natural gas pipeline in Texas, operated by WhiteWater.[1]
Contractorsedit
| Contractor | Work | Prime or sub | Scope | Years |
|---|---|---|---|---|
| MPG Pipeline Contractors[2] | Mainline (244.6 km of 42-inch) | |||
| Dun Transportation & Stringing, Inc.[6] | Pipe hauling | Loading, hauling and delivering to the right-of-way 160 miles of 42-inch pipe in seven South Texas counties | from 20 May 2026 | |
| MPG Pipeline Contractors, LLC[2] | Prime | Mainline: 244.6 km of 42-inch, wall 15.2 to 21.9 mm, X-70 (RMS project list) | ||
| RMS Welding Systems[2] | Mechanized welding | Under MPG Pipeline Contractors, LLC | MOWII mechanized welding system on the mainline |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Traverse Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Projects (MOWII)”. RMS Welding Systems. Retrieved 3 October 2026.
- traversepipeline.com
- “Traverse Pipeline reaches final investment decision to transport natural gas between Agua Dulce and the Katy area”. World Pipelines (WhiteWater release of 2025-04-03). 7 April 2025. Retrieved 3 October 2026.
- “2025 new T-4 permits (permit 10688, WWM Operating, LLC: the T-4 permit EIA lists for Traverse)”. Railroad Commission of Texas. 3 December 2025. Retrieved 3 October 2026.
- “Job posting: Dun Transportation and Stringing for Whitewater (notified 2026-05-18)”. Teamsters National Pipeline. 18 May 2026. Retrieved 3 October 2026.
- “MPLX LP Reports Fourth-Quarter and Full-Year 2025 Results (Form 8-K, Exhibit 99.1)”. MPLX LP (filed with the SEC). 3 February 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.