TTC Connector TTC Project is a natural gas pipeline in Texas, operated by TTC Connector, LLC. Construction began in 2026. It runs 25 miles of 20" pipe.
| TTC Connector TTC Project | |
|---|---|
| Also called | TTC Connector Pipeline Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | New build[1] |
| Status | Approved[1] or Under construction[3][sources disagree] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Texas[1][4][5] |
| Counties | Colorado, Wharton[6] |
| Approved | 5 June 2026[4][6] |
| Construction started | August 2026[3] |
| FERC docket | CP25-525[2] |
| Technical information | |
| Length | 25 mi[1][4][5] |
| Pipe size | 20"[1] |
| Capacity | 300 MMcf/d (FERC project list)[1][4][5] or up to 300,000 Dth/d of firm transportation service[6][sources disagree] |
| Cost | estimates that the total cost of the project will be $114,310,882[6] |
| On ProvenHand | |
| Hands listed | 0 |
TTC Connector TTC Project is a natural gas pipeline in Texas, operated by TTC Connector, LLC. Construction began in 2026. It runs 25 miles of 20" pipe.
Inspection
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Status |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on TTC Connector TTC Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP25-525”. Federal Energy Regulatory Commission. 21 July 2025. Retrieved 3 October 2026.
- “Biweekly Construction Status Report No. 3 (07/25/2026 to 08/07/2026), TTC Connector Project (CP25-525)”. TTC Connector, LLC (filed with FERC). 7 August 2026. Retrieved 4 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
- “Order Issuing Certificates, TTC Connector Project (CP25-525)”. Federal Energy Regulatory Commission. 5 June 2026. Retrieved 4 October 2026.
- “Field Inspection Report, TTC Connector Project, inspected 2026-09-01 (CP25-525)”. Federal Energy Regulatory Commission. 14 September 2026. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.