Valley Expansion Project is a natural gas pipeline expansion in Minnesota and North Dakota, operated by WBI Energy Transmission, Inc.. It entered service in 2018. It runs 37.3 miles of 16" pipe.
| Valley Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Minnesota, North Dakota[1][2] |
| Counties | Minnesota: Clay North Dakota: Barnes, Burleigh, Cass, Stutsman[3] |
| Approved | 15 February 2018[1] |
| In service | 31 October 2018[2] |
| FERC docket | CP17-257[1] |
| FERC pre-filing docket | PF16-10[4] |
| Technical information | |
| Length | 37.3 mi[1][2] |
| Pipe size | 16"[2] |
| Capacity | 40.9 MMcf/d (FERC project list)[1] or 33 MMcf/d additional capacity (EIA)[2][sources disagree] |
| Cost | $57.3 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Valley Expansion Project is a natural gas pipeline expansion in Minnesota and North Dakota, operated by WBI Energy Transmission, Inc.. It entered service in 2018. It runs 37.3 miles of 16" pipe.
Inspection
| Firm | Scope |
|---|---|
| Tetra Tech, Inc.[5] | FERC's third-party contractor on the Commission's construction/environmental inspections |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Valley Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, August 2019)”. Pipeline News. August 2019. Retrieved 3 October 2026.
- “FERC eLibrary docket CP17-257”. Federal Energy Regulatory Commission. 26 April 2017. Retrieved 3 October 2026.
- “Construction Inspection Report, Valley Expansion Project (CP17-257)”. Federal Energy Regulatory Commission. 25 July 2018. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.