Wahpeton Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Wahpeton Expansion Project is a natural gas pipeline expansion in North Dakota, operated by WBI Energy Transmission, Inc..

Wahpeton Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[1][2]
StatusIn service[2][3]
CommodityNatural gas[2]
Owner and operator
StateNorth Dakota[2][4]
CountiesCass, Richland[5]
Approved23 October 2023[4][5]
Construction startedMarch 2024[6] or June 2024[7][sources disagree]
In serviceNovember 2024[2] or 1 December 2024[3][8][sources disagree]
FERC docketCP22-466[1]
FERC pre-filing docketPF21-4[1]
Technical information
Length60.5 mi[4] or 60 mi[2] or 60.2 mi[7][9][sources disagree]
Pipe size12"[2]
Wall thickness0.25, 0.312 and 0.5 in[10]
GradeX65[10]
Mill coatingFBE; FBE with ARO at bored crossings[10]
Capacity20.6 MMcf/d (FERC project list)[2][4]
Cost$75 million (EIA estimate; no dollar year given)[2] or $75,313,022 estimated (certificate order)[5][sources disagree]
On ProvenHand
Hands listed0

Wahpeton Expansion Project is a natural gas pipeline expansion in North Dakota, operated by WBI Energy Transmission, Inc..

Inspection

FirmScopeYears
Tetra Tech, Inc.[11]FERC contractor for post-certification compliance inspections, working under contract to FERCfrom 1 May 2024

Spreads

SpreadDates
Wahpeton Expansion Pipeline (mainline)[9][12]from 1 June 2024

Crossings

FeatureMethod
Antelope River and Wild Rice River crossings 1-3 (MP 51.10)[13]Guided bore
BNSF Railroad (MP 5.14)[13]Guided bore
Interstate 29 (MP 40.97)[13]Guided bore
Interstate 94 (MP 5.94)[13]Guided bore
Maple River (MP 1.23)[13]Guided bore
Pitcairn Creek (MP 44.95)[13]Guided bore
Red River Valley and Western Railroad and 47th St SE (MP 16.71)[13]Guided bore
Sheyenne River (MP 24.15)[13]Guided bore

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Construction started
Cost
  • $75 million (EIA estimate; no dollar year given)[2]
  • $75,313,022 estimated (certificate order)[5]
In service
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Wahpeton Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP22-466”. Federal Energy Regulatory Commission. 27 May 2022. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notification of In-Service Date, Wahpeton Expansion Project (CP22-466)”. WBI Energy Transmission, Inc. (filed with FERC). 3 December 2024. Retrieved 3 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “Order Issuing Certificate, Wahpeton Expansion Project (CP22-466)”. Federal Energy Regulatory Commission. 23 October 2023. Retrieved 3 October 2026.
  6. “Weekly Status Report No. 15 (Mar 4 to Mar 10, 2024), Wahpeton Expansion Project (CP22-466)”. WBI Energy Transmission, Inc. (filed with FERC). 14 March 2024. Retrieved 3 October 2026.
  7. “Wahpeton Expansion Project page”. WBI Energy Transmission, Inc. Retrieved 3 October 2026.
  8. “MDU Resources Group, Inc. fourth-quarter and full-year 2024 earnings release (Exhibit 99)”. MDU Resources Group, Inc. (filed with SEC). 6 February 2025. Retrieved 3 October 2026.
  9. “FERC Field Inspection Report, June 26, 2024, Wahpeton Expansion Project (CP22-466)”. Federal Energy Regulatory Commission. 18 July 2024. Retrieved 3 October 2026.
  10. “Implementation Plan (with alignment sheets), Wahpeton Expansion Project (CP22-466)”. WBI Energy Transmission, Inc. (filed with FERC). 1 December 2023. Retrieved 3 October 2026.
  11. “FERC memorandum on organizational conflicts of interest, selection of a FERC contractor for compliance inspections, Wahpeton Expansion Project (CP22-466)”. Federal Energy Regulatory Commission. 7 May 2024. Retrieved 3 October 2026.
  12. “Weekly Status Report No. 28 (Jun 3 to Jun 9, 2024), Wahpeton Expansion Project (CP22-466)”. WBI Energy Transmission, Inc. (filed with FERC). 13 June 2024. Retrieved 3 October 2026.
  13. “Final Environmental Impact Statement, Wahpeton Expansion Project (CP22-466)”. Federal Energy Regulatory Commission. 7 April 2023. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.