WB (West Bound) Xpress (west)
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
WB (West Bound) Xpress (west) is a natural gas pipeline expansion in West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2018.
| WB (West Bound) Xpress (west) | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | West Virginia[1] |
| In service | 4 October 2018[1] |
| FERC docket | CP16-38[1] |
| FERC pre-filing docket | PF15-21[1] |
| Contractors | |
| Technical information | |
| Length | 29 mi[1] or 30 mi[2][sources disagree] |
| Pipe size | 12", 26", 36"[2] |
| Capacity | 800 MMcf/d additional capacity (EIA)[1] or Western Build can move 760 MMcfd[3][sources disagree] |
| Cost | $780 million (EIA estimate; no dollar year given)[1] or the $900-million WBX project[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
WB (West Bound) Xpress (west) is a natural gas pipeline expansion in West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2018.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| WHC Energy Services[2] | Pipeline replacement (contractor listed by PGJ) | Pipeline replacement, WB Xpress (listing covers the whole project) |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Cost | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on WB (West Bound) Xpress (west)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, October 2018)”. Pipeline News. October 2018. Retrieved 3 October 2026.
- “TransCanada starts first WB Xpress phase”. Oil & Gas Journal. 5 October 2018. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.