Chilton Loop Pipeline Project
From the ProvenHand pipeline wiki
Chilton Loop Pipeline Project is a pipeline loop in Alabama, operated by Williams. It runs 1.9 miles of 42" pipe.
| Chilton Loop Pipeline Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Loop[1] |
| Owner | |
| Part of | Southeast Energy Connector Project[2] |
| State | Alabama[1] |
| Counties | Chilton, Coosa[1] |
| FERC docket | CP22-501[3] |
| Contractors | |
| Technical information | |
| Length | 1.9 mi[3] |
| Pipe size | 42"[1] |
| On ProvenHand | |
| Hands listed | 0 |
Chilton Loop Pipeline Project is a pipeline loop in Alabama, operated by Williams. It runs 1.9 miles of 42" pipe.
Contractorsedit
| Contractor | Work | Prime or sub | Scope | Years |
|---|---|---|---|---|
| The Hillis Group, LLC[1] | Clearing and reclamation | Hydroseed restoration of about 45 acres of right-of-way, laydown yards and sensitive areas, Chilton and Coosa Counties, AL (Fall 2024) | 1 January 2024 | |
| Hoover Construction Company[4] | Rock drilling and blasting | Under U.S. Pipeline, Inc. | 1.8 miles of drilling and blasting for the 42-inch Chilton Loop, Chilton and Coosa Counties, AL | from 8 March 2024 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Chilton Loop Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Chilton Loop Hydroseeding - The Hillis Group, LLC”. The Hillis Group, LLC. Retrieved 3 October 2026.
- “Order Issuing Certificate, Southeast Energy Connector Project (CP22-501)”. FERC. 16 November 2023. Retrieved 3 October 2026.
- “Request for notice to proceed with construction at the Chilton Loop Facility et al., Southeast Energy Connector Project (CP22-501)”. Federal Energy Regulatory Commission (eLibrary filing). 16 January 2024. Retrieved 4 October 2026.
- “Hoover Construction job notice: U.S. Pipeline / Williams Chilton Loop, Alabama (dated 2024-02-28)”. Teamsters National Pipeline. 28 February 2024. Archived from the original on 20 April 2024. Retrieved 6 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.