Southeast Energy Connector Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Southeast Energy Connector Project is a natural gas pipeline expansion in Alabama, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2024. It runs 1.9 miles of 42" pipe.

Southeast Energy Connector Project
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
Facility projects
StateAlabama[1][2]
CountiesChilton, Coosa[3]
Approved16 November 2023[1][3]
Construction started13 February 2024[4]
In serviceMarch 2025[2] or 1 April 2025[5][sources disagree]
FERC docketCP22-501[1]
FERC pre-filing docketPF22-6[6]
Contractors
Technical information
Length1.9 mi[1][2]
Pipe size42"[2]
Capacity150 MMcf/d (FERC project list)[1][2]
Cost$154.9 million (EIA estimate; no dollar year given)[2] or $154,907,369[3][sources disagree]
On ProvenHand
Hands listed0

Southeast Energy Connector Project is a natural gas pipeline expansion in Alabama, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2024. It runs 1.9 miles of 42" pipe.

Contractorsedit

ContractorWorkScope
SWCA Environmental Consultants[7]Environmental consulting (permitting, field surveys, compliance support)FERC application support, resource surveys, construction compliance support and post-construction monitoring
Michels Trenchless, Inc.[8]HDD and boreCoosa River HDD: 3,400 ft of 42-inch installed with dual maxi-rigs and conductor casing (Pipeliners Association of Houston Project of the Year 2025)

Crossings

FeatureMethod
Coosa River (Chilton Loop)[9]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $154.9 million (EIA estimate; no dollar year given)[2]
  • $154,907,369[3]
In service

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Southeast Energy Connector Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, Southeast Energy Connector Project (CP22-501)”. FERC. 16 November 2023. Retrieved 3 October 2026.
  4. “Biweekly Construction Status Report (Feb 5-18, 2024), Southeast Energy Connector Project (CP22-501)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 21 February 2024. Retrieved 3 October 2026.
  5. “Notice that project facilities were placed into full service on 04/01/2025, Southeast Energy Connector Project (CP22-501)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 2 April 2025. Retrieved 3 October 2026.
  6. “FERC eLibrary docket CP22-501”. Federal Energy Regulatory Commission. 22 August 2022. Retrieved 3 October 2026.
  7. “Southeast Energy Connector in Chilton and Coosa Counties, Alabama (Transcontinental Gas Pipeline Company, LLC)”. SWCA. Retrieved 3 October 2026.
  8. “Coosa River Crossing Named Project of the Year”. Michels Corporation. 9 December 2025. Retrieved 6 October 2026.
  9. “Environmental Assessment, Southeast Energy Connector Project (CP22-501)”. FERC Office of Energy Projects. 24 March 2023. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.