North Bakken Expansion Project is a natural gas pipeline in North Dakota, operated by WBI Energy Transmission, Inc./North Bakken Expansion Project Amendment. Construction began in 2021.
| North Bakken Expansion Project | |
|---|---|
| Also called | North Bakken Expansion Project Amendment[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | New build[3] |
| Status | In service[3][4] |
| Commodity | Natural gas[3] |
| Operator | WBI Energy Transmission, Inc./North Bakken Expansion Project Amendment[2] |
| Operator | |
| Owner and operator | |
| State | North Dakota[2][3] |
| Counties | Burke, McKenzie, Mountrail, Williams[5] |
| Approved | 1 June 2021[2][5] |
| Construction started | July 2021[6] |
| In service | 26 January 2022[3] or 1 February 2022[4][7][sources disagree] |
| FERC docket | CP20-52[2] |
| FERC pre-filing docket | PF19-7[2] |
| Contractors | |
| Technical information | |
| Length | 92.5 mi[2] or 62 mi[3][sources disagree] |
| Pipe size | 20"[3] |
| Capacity | 250 MMcf/d (FERC project list)[2] or 245 MMcf/d additional capacity (EIA)[3][sources disagree] |
| Cost | $260.5 million (EIA estimate; no dollar year given)[3] |
| On ProvenHand | |
| Hands listed | 0 |
North Bakken Expansion Project is a natural gas pipeline in North Dakota, operated by WBI Energy Transmission, Inc./North Bakken Expansion Project Amendment. Construction began in 2021.
Contractorsedit
| Contractor | Work | Prime or sub | Scope |
|---|---|---|---|
| Michels Pipeline, Inc.[8] | Prime | 63 miles of 24-inch, 30 miles of 12-inch, a half mile each of 20- and 8-inch steel pipe, 11 launcher/receiver barrels, six mainline valves, 70 bores and 38 HDDs (firm's figures) | |
| Michels Pipeline, Inc.[8] | Prime | awarded construction of 63 miles of 24-inch, 30 miles of 12-inch, 0.5 mile of 20-inch and 0.5 mile of 8-inch pipeline, 11 launcher/receiver barrels and six mainline valves; crews completed 70 bores and 38 HDDs | |
| Michels Pipeline, Inc.[7] | Prime | named by WBI Energy as its main contractor on the project (written there as Michels Corp.) | |
| Michels Trenchless, Inc.[8] | HDD and bore | Under Michels Pipeline, Inc. | 15,426-foot horizontal directional drill of 24-inch pipe under Lake Sakakawea on the Missouri River, with pipe support from Michels Pipeline |
Inspection
| Firm | Scope |
|---|---|
| Cardno, Inc.[9] | third-party compliance monitor under a memorandum of understanding between FERC, WBI Energy Transmission and Cardno, Inc., signed August 2021 |
Crossings
| Feature | Method | Contractor | Dates |
|---|---|---|---|
| Lake Sakakawea (Missouri River)[8][10][11] | HDD | Michels Trenchless, Inc. | until 1 January 2021 |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| In service | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on North Bakken Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP20-52”. Federal Energy Regulatory Commission. 14 February 2020. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notification of In-Service Date, North Bakken Expansion Project (CP20-52)”. WBI Energy Transmission, Inc. (filed with FERC). 2 February 2022. Retrieved 4 October 2026.
- “Order Issuing Certificate, WBI Energy Transmission, Inc. (CP20-52)”. Federal Energy Regulatory Commission. 1 June 2021. Retrieved 4 October 2026.
- “MDU Resources Subsidiary Begins Construction on ND Natural Gas Pipeline Project”. MDU Resources Group, Inc. (PR Newswire). 19 July 2021. Retrieved 4 October 2026.
- “WBI Energy Finishes Construction, Begins Transporting Natural Gas on ND Pipeline”. WBI Energy, Inc. 1 February 2022. Retrieved 4 October 2026.
- “North Bakken Expansion - Michels Corporation”. Michels Corporation. Retrieved 3 October 2026.
- “Memorandum of Understanding for Third-Party Compliance Monitoring, North Bakken Expansion Project (CP20-52)”. WBI Energy Transmission, Inc. (filed with FERC). 5 August 2021. Retrieved 4 October 2026.
- “North Bakken Expansion HDD - Michels Corporation”. Michels Corporation. Retrieved 3 October 2026.
- “About Us (Michels Pipeline, Inc.): company history”. Michels Corporation. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.