Transco Regional Energy Access Expansion is a natural gas pipeline expansion in Maryland, New Jersey and Pennsylvania. Construction began in 2023 and the line entered service in 2024.

Transco Regional Energy Access Expansion
Also calledRegional Energy Access Project (Phase I and II)[1], Regional Energy Access Expansion Project[2]
General information
KindPipeline project[3]
Project typeExpansion[2][3][4]
StatusIn service[4]
CommodityNatural gas[4]
OperatorWilliams (Transco)[3] or Transcontinental Gas Pipe Line Company, LLC[3][sources disagree]
Owner and operator
Facility projects
StatesMaryland, New Jersey, Pennsylvania[1][4][5]
Approved11 January 2023[1]
Construction started16 March 2023[6]
In service12 July 2024[4]
LaborUnion[7]
FERC docketCP21-94[1]
FERC pre-filing docketPF20-3[3]
Contractors
Technical information
Length35.8 mi[4] or 36.1 mi[1][sources disagree]
Pipe size30", 42"[4]
Capacity829.4 MMcf/d (FERC project list)[1] or 829 MMcf/d additional capacity (EIA)[4][sources disagree]
On ProvenHand
Hands listed0

Transco Regional Energy Access Expansion is a natural gas pipeline expansion in Maryland, New Jersey and Pennsylvania. Construction began in 2023 and the line entered service in 2024.

Contractorsedit

ContractorWorkPrime or subScopeSpreadYears
Associated Pipe Line Contractors, Inc.[7]Prime13.78 miles of 42-inch new lay steel pre-jobbed at Saylorsburg, PA (the Effort Loop in Monroe County); the union's July 2023 report says Michels and Associated picked up the Williams REA project in PennsylvaniaEffort Loopfrom 1 January 2023
Hoover Construction Company[8]Rock drilling and blastingUnder Associated Pipe Line Contractors, Inc.Drilling and blasting for 13.6 miles of 42-inch (Effort Loop), Monroe County, PAEffort Loopfrom 17 May 2023
Michels Trenchless, Inc.[9]HDD and boreDirect Pipe install of about 1,348 ft of 42-inch sacrificial casing under the Susquehanna River, then a 30-inch X70 pipeline with HDD pull support
Michels Pipeline, Inc.[10]Prime22.3 miles of 30-inch in Luzerne County, PA, including 3,600 ft of bores and a Direct Pipe crossing under the Susquehanna River (PAH Project of the Year 2024)

Spreads

SpreadPrime contractor
Effort Loop[8][11]Associated Pipe Line Contractors, Inc.

Crossings

FeatureMethodContractor
Susquehanna River[9]Direct pipeMichels Trenchless, Inc.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 829.4 MMcf/d (FERC project list)[1]
  • 829 MMcf/d additional capacity (EIA)[4]
Length
Operator
  • Williams (Transco)[3]
  • Transcontinental Gas Pipe Line Company, LLC[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Transco Regional Energy Access Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP21-94”. Federal Energy Regulatory Commission. 26 March 2021. Retrieved 3 October 2026.
  3. “FERC eLibrary docket PF20-3”. Federal Energy Regulatory Commission. 11 June 2020. Retrieved 3 October 2026.
  4. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  5. “Final Environmental Impact Statement, Regional Energy Access Expansion (CP21-94)”. FERC staff. 29 July 2022. Retrieved 4 October 2026.
  6. “Biweekly Construction Status Report (Mar 11-24, 2023), Regional Energy Access Expansion (CP21-94)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 29 March 2023. Retrieved 4 October 2026.
  7. “Blue Light Reports, July/August 2023”. Pipeliners Local Union 798. July 2023. Retrieved 6 October 2026.
  8. “Hoover Construction job notice: Associated Pipeline / Williams Effort Loop, Pennsylvania (dated 2023-05-17)”. Teamsters National Pipeline. 17 May 2023. Archived from the original on 28 May 2023. Retrieved 6 October 2026.
  9. “Regional Energy Access Expansion Project - Michels Corporation”. Michels Corporation. Retrieved 3 October 2026.
  10. “Pipeline expansion wins Project of the Year award”. Michels Corporation. 27 January 2025. Retrieved 6 October 2026.
  11. “Regional Energy Access Expansion Project, 401 Water Quality Certification Application, Section 7.0 Detailed Project Summary (Rev. 1)”. Transcontinental Gas Pipe Line Company, LLC (filed with PA DEP). March 2022. Retrieved 6 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.