WB XPress is a natural gas pipeline in West Virginia and Virginia, operated by Columbia Gas Transmission (TransCanada). Construction began in 2017 and the line entered service in 2018.[1]
| WB XPress | |
|---|---|
| Also called | WB XPress Project, WB Express |
| General information | |
| Status | In service[5] |
| Commodity | Natural gas |
| Operator | Columbia Gas Transmission (TransCanada) |
| Owner and operator | |
| States | West Virginia, Virginia[6] |
| Counties | Virginia: Fairfax West Virginia: Kanawha, Pendleton, Randolph[7] |
| Approved | 17 November 2017[6] |
| Construction started | December 2017[8] |
| In service | 16 November 2018[5] |
| FERC docket | CP16-38[6] |
| FERC pre-filing docket | PF15-21[9] |
| Contractors | |
| Technical information | |
| Length | 29.3 mi or 29.2 mi[6][sources disagree] |
| Pipe size | 12", 26", 36"[7] |
| Capacity | 1300 MMcf/d (FERC project list)[6] |
| Cost | $884,456,711 total project cost (actual, final cost report)[10] |
| On ProvenHand | |
| Hands listed | 0 |
WB XPress is a natural gas pipeline in West Virginia and Virginia, operated by Columbia Gas Transmission (TransCanada). Construction began in 2017 and the line entered service in 2018.[1]
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| WHC Energy Services[4] | Pipeline replacement | ||
| Right-Of-Way Clearing & Maintenance, Inc.[11] | Clearing and reclamation | Clearing; listed as WB Xpress Project, Elkins WV (Apex Pipeline/Columbia Gas Transmission) | until 1 January 2018 |
| WHC Energy Services[7] | Prime | Pipeline replacement (listed 2018) |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Length |
|
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on WB XPress? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- ferc.gov · CP16-38-Notice.pdf
- tcenergy.com
- pgjonline.com
- s3.amazonaws.com · PLN0718_ongoing.pdf
- “Eastern Facilities' Notice of Commencement of Service, WB XPress Project (CP16-38)”. Columbia Gas Transmission, LLC (filed with FERC). 16 November 2018. Retrieved 4 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, October 2018)”. Pipeline News. October 2018. Retrieved 3 October 2026.
- “Construction Status Report No. 2, WB XPress Project (CP16-38)”. Columbia Gas Transmission, LLC (filed with FERC). 21 December 2017. Retrieved 4 October 2026.
- “FERC eLibrary docket CP16-38”. Federal Energy Regulatory Commission. 30 December 2015. Retrieved 3 October 2026.
- “WB XPress Project Final Cost Report (CP16-38)”. Columbia Gas Transmission, LLC (filed with FERC). 15 May 2019. Retrieved 4 October 2026.
- “Projects”. Right-Of-Way Clearing & Maintenance, Inc. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.