Energy Transfer

From the ProvenHand pipeline wiki

Energy Transfer is a pipeline owner-operator based in Houston, Texas.

Energy Transfer
Legal nameENERGY TRANSFER COMPANY[1]
General information
Industry
HeadquartersHouston, Texas[1]
PHMSA operator ID32099[2]
Texas RRC operator number (P-5)252017[2]
On ProvenHand
Hands listed0

Energy Transfer is a pipeline owner-operator based in Houston, Texas.

This company article is a stub. You can help ProvenHand by expanding it.

Pipeline systems and facilities

1,333 systems and facilities this company owned or operated, current ones first (showing 1,301–1,333).

System or facilityKindStateRole
Wharton (RRC 531657)[5]Pipeline systemTXOperator
Wharton (RRC 532008)[5]Pipeline systemTXOperator
Wharton (RRC 532861)[5]Pipeline systemTXOperator
Wharton (RRC 732018)[5]Pipeline systemTXOperator
Wharton (RRC 961160)[5]Pipeline systemTXOperator
Wharton (RRC 964124)[5]Pipeline systemTXOperator
Wharton (RRC 967984)[5]Pipeline systemTXOperator
Wharton (RRC 967985)[5]Pipeline systemTXOperator
Wharton (RRC 969267)[5]Pipeline systemTXOperator
Wharton (RRC 969277)[5]Pipeline systemTXOperator
Wharton (RRC 969279)[5]Pipeline systemTXOperator
Wharton (RRC 969283)[5]Pipeline systemTXOperator
Wharton (RRC 969284)[5]Pipeline systemTXOperator
Wharton (RRC 969291)[5]Pipeline systemTXOperator
Wharton (RRC 969329)[5]Pipeline systemTXOperator
Wharton (RRC 969352)[5]Pipeline systemTXOperator
Wharton (RRC 969384)[5]Pipeline systemTXOperator
Wharton (RRC 969397)[5]Pipeline systemTXOperator
Wharton (RRC 969398)[5]Pipeline systemTXOperator
Wharton (RRC 969412)[5]Pipeline systemTXOperator
Wharton (RRC 969413)[5]Pipeline systemTXOperator
Wharton (RRC 969414)[5]Pipeline systemTXOperator
Wharton (RRC 969572)[5]Pipeline systemTXOperator
Wharton (RRC 969622)[5]Pipeline systemTXOperator
Wharton (RRC 969663)[5]Pipeline systemTXOperator
Wharton (RRC 969817)[5]Pipeline systemTXOperator
Wharton (RRC 969936)[5]Pipeline systemTXOperator
Wharton (natural gas)[5]Pipeline systemTXOperator
Wheeler Residue System[5]Pipeline systemTXOperator
Winnie Discharge[5]Pipeline systemTXOperator
Woody 3737h Injection Discharge[5]Pipeline systemTXOperator
Wortham Discharge[5]Pipeline systemTXOperator
Zapata[5]Pipeline systemTXOperator

← previous page (page 14 of 14)

Projects

As owner or operator

ProjectRoleStatusProject built
Louisiana Energy Gateway (LEG)[6]Owner and operatorIn service2025
Oasis Pipeline Modernization Project[2]OperatorIn service2022
Red Bluff Express Extension[2]OperatorIn service2019
Red Bluff Express Pipeline[2]OperatorIn service2018
Revolution Pipeline[2]OperatorIn service2016–2018
ET Cleburne to Tolar Extension[2]OperatorIn service2009
ET Katy Pipeline Expansion[2]OperatorIn service2009
ET Southern Shale[2]OperatorIn service2009
ET Carthage Loop Expansion[2]OperatorIn service2008
ET Maypearl to Malone[2]OperatorIn service2008
ET North side to Paris Loop[2]OperatorIn service2008
ET Southeast Boosier Pipeline Phase 1[2]OperatorIn service2008
ET Southeast Boosier Pipeline Phase 2[2]OperatorIn service2008
ET Barnett-Texoma Expansion Phase 3[2]OperatorIn service2007
ET Barnett-Texoma Expansion Phase 1[2]OperatorIn service2006
ET Barnett-Texoma Expansion Phase 2[2]OperatorIn service2006
ET Forth Worth Basin Looping[2]OperatorIn service2006
ET Mayprearl to Mansfield Line[2]OperatorIn service2006
ET Forth Worth Basin Pipeline[2]OperatorIn service2005
ET Kathy Bossier Pipeline[2]OperatorIn service2004
Cadiz to DEO[7]Owner
Canton Lateral Pipeline[8]Owner
Energy Transfer coastal use permit P20200603 pipeline[9]Owner and operator
Green Chile Project[2]OperatorProposed
Hugh Brinson Pipeline (formerly Warrior Pipeline) Phase I & II[2]OperatorUnder construction
Katy Pipeline Project[10]Owner
Lake Charles LNG[3]OwnerApproved
Oracle Data Center Laterals (Hugh Brinson / North Texas)[2]OperatorUnder construction
Revolution Gathering Phase II[11]Operator
South Mississippi Project[2]OperatorAnnounced
Tiger Pipeline Expansion Project[2]OperatorProposed

References

  1. “PHMSA annual report data: annual hazardous liquid 2010 present”. Pipeline and Hazardous Materials Safety Administration. Archived from the original on 8 May 2026. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
  4. “FERC: U.S. LNG import terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
  5. “Railroad Commission of Texas: Pipeline Layers by County (digital map data)”. Railroad Commission of Texas. 3 October 2026. Retrieved 3 October 2026.
  6. “FERC eLibrary docket CP24-122”. Federal Energy Regulatory Commission. 8 April 2024. Retrieved 3 October 2026.
  7. “Energy Transfer – Cadiz to DEO | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 9 April 2019. Retrieved 3 October 2026.
  8. “PGI-Energy Transfer Canton Lateral Pipeline”. Mascaro Construction Company, LP. Retrieved 6 October 2026.
  9. “Louisiana DENR Office of Coastal Management: Coastal Permits Lines (pipelines)”. Louisiana Department of Energy and Natural Resources. Retrieved 3 October 2026.
  10. “Past Projects”. Rockford Corporation. Archived from the original on 10 October 2015. Retrieved 3 October 2026.
  11. “Current Projects - MG Dyess (2016 capture)”. M.G. Dyess, Inc. Archived from the original on 22 October 2016. Retrieved 6 October 2026.
Energy Transfer - ProvenHand Pipeline Wiki